Skip to Main Navigation

Urban transit systems : guidelines for examining options (English)

This paper compares the characteristics and costs of the main types of urban transit systems, including buses, trains, light rail, rapid rail and suburban rail systems. As well as covering the examination of existing transport systems, the paper suggests a simple and quick screening process to avoid costly detailed examination of inappropriate solutions and to focus attention on systems most likely to meet the particular needs of a city. The paper asserts the need for careful consideration of all the implications of new transit systems before firm commitments are made to any systems in particular. The gudelines also provide a series of checks to ensure that important questions, such as feasibility to meet changing demands, problems of revenue leakage, undue sophistication of systems, financing and cost recovery, and environmental impact, are not overlooked. Annexes to the paper contain details of city transport characteristics, bus services and rail services, together with brief case studies of transit systems in both developing and developed countries.

Details

  • Author

    Armstrong-Wright, Alan

  • Document Date

    1986/05/31

  • Document Type

    Publication

  • Report Number

    WTP52

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    World,

  • Region

    The World Region,

  • Disclosure Date

    2010/07/01

  • Doc Name

    Urban transit systems : guidelines for examining options

  • Keywords

    vehicle cost;operation of waste stabilization ponds;household expenditure on transport;ventilated improved pit latrine;total number of people;annual per capita income;passenger per hour;rail system;suburban rail system;types of transit;central government official;commuter rail system;cost of transit;degree of sophistication;Public Transit System;existing bus route;aid agency staff;source of funding;power transmission system;tropical forest regions;speed of transit;rail transit system;procedure settlement;life of vehicle;urban population growth;reducing environmental impact;cost of labor;expenditure of funds;cost of vehicle;cost of car;interchange between mode;frequency of service;traffic management measure;urban transit system;competing bus route;agriculture and forestry;external technical assistance;city development plan;urban transport system;urban transport sector;modes of transit;capital recovery;number of passengers;construction of tunnel;cut and cover;base year;mixed traffic;future demand;journey time;city authority;transit service;transit option;Public Transport;rolling stock;bus service;transit vehicle;suburban railway;transit operation;transport study;fare structure;detailed examination;transit operator;public street;exclusive use;exclusive right;fare level;bus operation;round trip;calculation sheet;investment program;financial evaluation;intercity passenger;interest charge;freight train;comparative cost;laboratory testing;feeder service;comparative analysis;interest cost;rail car;household income;large bus;fare collection;rail service;bus transit;transit corridor;financial implication;passenger flow;radial corridor;energy cost;daily expenditure;single track;transport demand;working day;demand forecast;transport situation;traffic engineering;fuel price;cost-benefit analysis;bus fare;initial screening;road link;transit network;policy regard;bus network;study objectives;environmental grounds;operational aspect;Road Pricing;urban household;considerable difference;field data;travel characteristic;income trends;financial impact;environmental aspect;investment option;national budget;civil engineering;borderline cases;basic transport;city finance;study period;travel survey;professional work;transport planning;bus operating;income earning;transit patronage;approximate cost;high fare;investment need;economic appraisal;transport investment;transportation situation;hidden subsidy;fare evasion;city expenditure;staff recruitment;conventional bus;high capital;low-income people;transit fare;elevated structure;public corporation;average revenue;vehicle fleet;institutional constraint;city budget;financial restraint;metro system;fixed rail;freight traffic;power system;short period;peak demand;travel delay;bus stop;fuel substitution;passenger trip;large subsidy;integrated system;city road;utility service;weather condition;capital expenditure;finance charges;cement industry;capital subsidy;suburban section;intercity rail;commuter service;passenger seat;express service;Shuttle Service;basic skill;government regulation;limited resources;urban service;transport specialist;urban problem;transport operator;transport service;motor bus;trolley bus;intercity train;comparative data;alternative system;institutional building;Research Support;firm commitment;research program;local transit;Transport Systems;fixed infrastructure;adequate services;agricultural productivity;water quality;industrial restructuring;steel industry;flat rate;Enterprise Development;farming system;great lakes;municipal refuse;refinery industry;city service;african trypanosomiasis;world industry;quantitative analysis;water pump;warm climate;institution building;poultry enterprise;agricultural pest;urban poor;traffic prediction;cost method;fixed equipment;traffic corridor;roadway cost;ground level;pedestrian movement;foot bridge;road vehicle;grade separation;Traffic Control;traffic movement;street trading;standard clause;competitive bidding;bus passenger;bus lane;pricing policy

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Armstrong-Wright, Alan

Urban transit systems : guidelines for examining options (English). World Bank technical paper ; no. WTP 52 Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/122121468762577620/Urban-transit-systems-guidelines-for-examining-options