Details
-
Author
-
Document Date
2021/06/28
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR47363
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2021/06/28
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Lesotho Transport Infrastructure and Connectivity Project (LTIC) - P155229 - Sequence No : 08
-
Keywords
awareness-raising campaigns; User satisfaction Survey; road safety management; institutional strengthening; reduction in travel; average travel time; number of beneficiaries; improving road safety; road-safety campaign; fuel efficient vehicle; routine road maintenance; Investment Project Financing; agricultural market; accident reporting; budget allocation; local jobs; rainy season; improving infrastructure; rural area; emergency response; survey methodology; pedestrian travel; community base; Government Advisory; traffic police; awareness raising; awareness campaign; annual budget; construction period; procurement process; survey data; satisfactory progress; risk category; operation risk; results framework
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Ryskulova,Nargis
Disclosable Version of the ISR - Lesotho Transport Infrastructure and Connectivity Project (LTIC) - P155229 - Sequence No : 08 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/134431624876827060/Disclosable-Version-of-the-ISR-Lesotho-Transport-Infrastructure-and-Connectivity-Project-LTIC-P155229-Sequence-No-08