Details
-
Document Date
2012/10/29
-
Document Type
Procurement Plan
-
Report Number
75887
-
Volume No
8
-
Total Volume(s)
-
Country
-
Region
-
Disclosure Date
2013/03/12
-
Disclosure Status
Disclosed
-
Doc Name
Procurement plan for HBTI
-
Keywords
cell count;consultancy activities;surface coating;research facility;laminar flow;quality of teaching;effect of temperature;design of water;real time;learning resource;central facilities;temperature range;power supply;surface area;hard disk;food product;internet security;chemical treatment;class room;micro structure;sound recording;power output;plant cell;heating elements;hot air;surface tension;particle size;power input;test specimen;temperature control;work education;interdisciplinary research;food processing;peak power;pumping system;doctoral study;research output;food technology;learning need;sample collection;air flow;energy balance;food samples;work station;research development;computer science;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- DOCX
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
India - Vocational Training Improvement Project : procurement plan (Vol. 8) : Procurement plan for HBTI (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/134741468041476110/Procurement-plan-for-HBTI