Skip to Main Navigation

Turkey - Sixth Adaptable Program Lending for the Energy Community of South East Europe Project : environmental assessment (Vol. 9) : Environmental management plan for 380 kV Kucukbakkalkoy GIS substation - Maltepe GIS substation (English)

The objective of the Sixth Adaptable Program Lending for the Energy Community of South East Europe Project is to increase the reliability and capacity of the transmission system in Turkey and improve its ability to integrate renewable energy capacity. Negative measures include: solid and hazardous waste management, noise pollution, natural habitat, cultural heritage, soil erosion, and water pollution. Mitigation measures include: a) permit for wastewater discharge to receiving bodies (if there is such a discharge from the construction camp facilities); b) hazardous waste disposal permit for hazardous waste storage, or intermediate storage (if applicable); c) solid waste disposal permit (disposal of the solid wastes to the landfill site of the municipality due to solid waste generation in the camp facilities and during construction and operation activities); and d) permit to pass through a forest area (if applicable-except forestry lands to be protected).

Details

  • Document Date

    2011/02/01

  • Document Type

    Environmental Assessment

  • Report Number

    E2482

  • Volume No

    9

  • Total Volume(s)

    13 (See all volumes)

  • Country

    Türkiye,

  • Region

    Europe and Central Asia,

  • Disclosure Date

    2011/03/21

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental management plan for 380 kV Kucukbakkalkoy GIS substation - Maltepe GIS substation

  • Keywords

    construction work;industrial air pollution;electric and magnetic field;water pollution control;solid waste control;electricity transmission;construction and operation;construction machine;works control;background noise level;Environmental Management Plan;mitigation measure;monitoring plan;sewerage system;excavation work;construction activities;safety construction;safety belt;construction site;information flow;electric field;environmental performance;meeting room;national environmental;cultural asset;timing chart;public consultation;domestic waste;work regulation;official gazette;non-governmental organization;energy transmission;transmission line;environmental requirement;monitoring data;environmental noise;packaging waste;electromagnetic field;international operation;construction material;public assessment;protective clothes;public safety;construction stage;protective equipment;worker health;construction regulation;emergency situation;sound level;contamination control;fire fight;water source;work material;Technical Training;vehicle parking;safety rule;afforestation area;rural landscape;warning light;dry season;speed limitation;natural park;population center;special protection;supply of energy;heavy traffic;agricultural field;portable toilets;satellite image;fill material;month period;warning signs;safety operation;equipment operation;Construction Law;horizontal drilling;construction waste;excavation process;Police headquarters;required measure;safe traffic;international regulation;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Turkey - Sixth Adaptable Program Lending for the Energy Community of South East Europe Project : environmental assessment (Vol. 9) : Environmental management plan for 380 kV Kucukbakkalkoy GIS substation - Maltepe GIS substation (English). s.l. ; s.n. http://documents.worldbank.org/curated/en/134971468311109852/Environmental-management-plan-for-380-kV-Kucukbakkalkoy-GIS-substation-Maltepe-GIS-substation