Details
-
Author
-
Document Date
2020/11/23
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR44223
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/11/23
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Transport Sector Modernization and Corridor Trade Facilitation Project - P156900 - Sequence No : 08
-
Keywords
Institutional Strengthening and Capacity Building; data collection and analysis; safety of transport; private sector participant; average transit time; risk sharing facility; efficiency of transport; construction and operation; open source software; hiv / aids; customs clearance time; access to financing; Investment Project Financing; heavy cargo; customs modernization; fleet renewal; modern equipment; exam center; electronic transmission; operational procedure; social study; social studies; co2 emission; average cost; commercial bank; risk category; prevention campaign; mitigation measure; gender impact; operation risk; private operator; driving license; transport activity; road transport
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Soh,Alphonse
Disclosable Version of the ISR - Transport Sector Modernization and Corridor Trade Facilitation Project - P156900 - Sequence No : 08 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/138671606170602989/Disclosable-Version-of-the-ISR-Transport-Sector-Modernization-and-Corridor-Trade-Facilitation-Project-P156900-Sequence-No-08