DETAILS
-
2012/04/13
-
Implementation Status and Results Report
-
ISR6268
-
1
-
1
-
Disclosed
-
Indonesia - Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project : P112158 - Implementation Status Results Report : Sequence 02
-
social and environmental
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 171
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Johansen,Peter; Peter.
Indonesia - Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project : P112158 - Implementation Status Results Report : Sequence 02 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/156411468750542186