The objective of the Social Investment and Local Development Project for Armenia is to improve the quality and use of and access to community and intercommunity infrastructure. Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); waste collection and disposal pathways and sites will be identified for all major waste types expected from demolition and construction activities; mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers; the approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated in order to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; monitoring of new wastewater systems (before/after) will be carried out; construction vehicles and machinery will be washed only in designated areas where runoff will not pollute natural surface water bodies; and if the building is a designated historic structure, very close to such a structure, or located in a designated historic district, notification shall be made and approvals/permits be obtained from local authorities and all construction activities planned and carried out in line with local and national legislation.
Details
-
Author
-
Document Date
2017/06/08
-
Document Type
Environmental Assessment
-
Report Number
SFG3413
-
Volume No
2
-
Total Volume(s)
-
Country
-
Region
-
Disclosure Date
2017/06/08
-
Disclosure Status
Disclosed
-
Doc Name
Environmental and social review checklist for reconstruction of water distribution network in Anker community
-
Keywords
labor provision;traffic and pedestrian;water supply system;construction and demolition waste;disposal of construction waste;water distribution network;medical waste;construction site;types of cargo;water supply pipe;pollution of air;negative environmental impact;health care facility;health care facilities;international good practice;displacement of people;acquisition of land;surface water body;drinking water supply;expropriation of land;construction and operation;health and environment;water use;public property;construction activities;protected area;wastewater system;mitigation measure;water intake;demolition debris;land plot;national regulation;potable water;steel pipe;land allocation;sediment control;large trees;water line;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- DOCX
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Kapanadze,Darejan
Armenia - Social Investment and Local Development Project : environmental assessment (Vol. 2) : Environmental and social review checklist for reconstruction of water distribution network in Anker community (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/157481496914062925/Environmental-and-social-review-checklist-for-reconstruction-of-water-distribution-network-in-Anker-community