China - East China (Jiangsu) 500kV Transmission Project - environment assessment (Vol. 2) (English)

The East China Electric Power Group Corporation (ECEPGC) is proposing to construct the East China/Jiangsu 500 kV power transmission project to increase transmission capacity between the northern and southern regions of Jiangsu province. The East China (Jiangsu) Transmission Line Project includes the addition of more than 993 km of transmission line, the construction of nine additional substations, and the expansion of two existing substations. The project has a rural component as well as an urban component. Environmental impacts to water resources as a result of substation construction along both rural and urban components are expected to be both temporary and minimal, since the planned substations are not located in close proximity to water bodies. The project will require the removal of more than 800,000 trees, comprised of fruit trees and other planted varieties. Though trees in general provide habitat for birds and other wildlife, the trees lost for transmission line construction are domesticated varieties in rural agricultural areas that have been sufficiently fragmented to prevent their use as important wildlife habitat, and similar habitat will be developed in the new resettlement areas. Farmers will be compensated for loss in agricultural production as a result of land acquired for the project. Chinese law has strict regulations protecting all persons being resettled. No significant adverse impacts to wetlands are anticipated.

Details

  • Author

    Golder Associates, Inc. Nanjing Environmental Protection Research Institute, Ministry of Electric Power

  • Document Date

    2002/07/31

  • Document Type

    Environmental Assessment

  • Report Number

    E231

  • Volume No

    2

  • Total Volume(s)

    2

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2010/07/01

  • Doc Name

    China - East China (Jiangsu) 500kV Transmission Project - environment assessment

  • Keywords

    transmission line;electric and magnetic field;background noise level;construction and operation;power transmission line;law and regulation;construction period;national highway;inconvenience to pedestrian;temporary access road;environmental protection requirements;agricultural production loss;Water and Land;resettlement and rehabilitation;Post and Telecom;ownership of land;environmental protection management;environmental impact analysis;local building material;local transportation facility;construction of infrastructure;exploration of mineral;irrigation or drainage;ecological environment;electric field;construction machine;acoustic environment;physical environment;social environment;noise source;environmental air;cultural relic;construction work;cultural resource;measurement results;radio interference;power line;wastewater effluent;rare birds;living standard;crop plant;hydrological condition;land occupation;living quality;scenic spots;water bodies;hill area;wild animal;high-grade highway;agricultural ecology;cargo transportation;grain production;construction personnel;artificial wetland;cargo ship;agricultural field;industrial land;flood level;wetland ecology;construction site;power levels;short term impact;short-term impact;construction dust;scenic views;atmospheric environment;noise impact;industrial enterprise;Temporary Work;storm runoff;land use;factory buildings;mountainous area;labor allocation;daily life;preventative measure;sunny day;green vegetable;local economy;indirect employment;domestic animal;rainy season;tertiary industry;road building;flood water;construction company;research result;management authority;environmental analysis;construction machinery;navigable river;runoff water;small rivers;oil leakage;high-voltage transmission;sewage treatment;equipment safety;residential area;water navigation;Electric Power;river navigation;ambient air;monitoring plan;local industry;social situation;aquatic product;cross river;crop output;crop growth;walking path;power consumption;environment construction;social economy;water level;local resident;power network;fish pond;radio communication;high noise;commercial income;operational personnel;management method;social order;migration route;wireless communication;television station;temporary bridge;information collection;field intensity;land usage;artificial river;farming activity;construction road;turbid water;noise value;natural person;transportation traffic;safe operation;daily consumption;water catchment;land reallocation;crop harvest;mechanized farming;natural wetland;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Golder Associates, Inc. Nanjing Environmental Protection Research Institute, Ministry of Electric Power

China - East China (Jiangsu) 500kV Transmission Project - environment assessment (Vol. 2) (English). World Development Sources, WDS 1998-4 Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/166171468769194041/China-East-China-Jiangsu-500kV-Transmission-Project-environment-assessment