Skip to Main Navigation

China - Second Fujian Highway Project (Vol. 4) : Huaan Section Zhangzhou-Huaan Highway : Environmental Action Plan (English)

This report includes environmental impact assessments and action plans for the Second Fujian Highway Project, which constructs the Zhangzhou-Zhao'an Expressway and an interconnecting road and bridge program to relieve traffic congestion and improve the mobility and integration of inter-provincial trade, commerce, and tourism between Fujian and Guangdong provinces. Negative environmental impact mitigation include: Road surfaces, excavation areas, and construction sites will be sprayed with water and kept moist. Trucks will be distanced from residential sites or other sensitive spots. Ventilation fans will reduce air pollution. Asphalt mixing equipment will have dust collectors and be distanced from residential areas. Vegetation restoration including greenbelts on roadsides will rehabilitate the land. Afforestation, a soundproofing screen, and a restricted schedule for operating construction equipment and vehicles will reduce noise levels. Dumping levels will not exceed the surrounding ground level, intercepting ditches will be installed, blind pipes will discharge seepage, and borrow and spoil sites will be reconstructed or leveled after construction. To prevent water pollution, oil collection tanks, oil-water separators, garbage collecting stations, drainage gates, and controlled sand digging will be used, along with treatment of wastewater and sewage. Hazardous materials will be strictly monitored. Displaced persons will be resettled and compensated.

Details

  • Author

    Xian Highway Transportation University, Fujian Pr

  • Document Date

    1999/04/30

  • Document Type

    Environmental Assessment

  • Report Number

    E254

  • Volume No

    4

  • Total Volume(s)

    9

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2010/07/01

  • Disclosure Status

    Disclosed

  • Doc Name

    Huaan Section Zhangzhou-Huaan Highway : Environmental Action Plan

  • Keywords

    ambient air quality standard;drainage system;environmental monitoring;farm land;soil erosion;environmental action plan;Land Acquisition and Resettlement;construction period;construction and operation;construction material;environmental protection measures;noise level;daily average;local land use;protection of culture;noise mitigation measure;road traffic noise;wood land;environmental protection regulation;Maintenance of Drainage;local construction materials;sewage treatment facility;drinking water source;freight transport management;environmental protection department;management of road;traffic noise impact;night time noise;air pollution impact;irrigation and drainage;resettlement action plan;operation of transport;Traffic and Roads;control of vehicle;labour camp;land occupation;construction work;dangerous good;construction machine;septic tank;flying dust;environment protection;water quality;bulk material;machine operation;flood control;water pollution;road operation;noise standard;ambient noise;work shift;road pavement;irrigation system;transport regulation;pollutant concentration;speed limit;road section;green belt;effective work;noise pollution;surface layer;geological condition;rainy season;competent authority;retaining wall;ecological resource;waterway transport;public health;land area;sewage discharge;noise control;water resource;accident risk;waste treatment;forecast period;traffic rule;water drainage;capital construction;local public;road intersection;chemical material;hydrological system;vehicle regulation;river channel;temporary irrigation;discharge capacity;industrial area;local communication;community life;safety measure;accident pollution;bridge design;traffic regulation;fire fight;emergency response;explosive material;surface drainage;main river;parking area;Traffic Safety;environmental supervision;supervision system;sound insulation;cultural relic;wild life;garbage disposal;unpaved road;construction site;safety observation;environmental analysis;Social Sciences;disposal area;noise limit;flood discharge;road alignment;monitoring equipment;efficient road;assessment area;hilly area;Natural Resources;personnel training;human body;transport vehicle;surface soil;road engineering;river water;tunnel construction;sewage collection;local resident;school building;school school;cement concrete;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Xian Highway Transportation University Fujian Pr

China - Second Fujian Highway Project (Vol. 4) : Huaan Section Zhangzhou-Huaan Highway : Environmental Action Plan (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/186191468218658952/Huaan-Section-Zhangzhou-Huaan-Highway-Environmental-Action-Plan