Skip to Main Navigation

Georgia - Transmission Grid Stretching Project : Resettlement Plan (Vol. 6) : Resettlement action plan for construction of Akhaltsikhe-Batumi 220kv double circuit power transmission line - Segment II – Section II : km 7.7- km 40.8 (English)

The development objectives of the Transmission Grid Strengthening Project for Georgia are to provide reliable power transmission to the southwestern part of the grid, upgrade electricity exchange systems, and provide economically efficient, environmentally, and socially sustainable electricity sector planning. Some of the negative impacts and mitigation measures include: (1) for agricultural lands - cash compensation at full replacement cost at current market value without deduction of depreciation value and transaction fees or replacement land of same value of land lost and at location acceptable to project affected people (PAPs) where feasible; (2) easement agreement will include a lump sum easement fee payable to the owner. Such fee to be established by an independent valuation experts; (3) PAPs will receive compensation and replacement value for the house and will be provided with resettlement assistance to ensure that the family relocates in a new house with access to services and security of tenure; (4) compensation at full replacement cost for lost structures, in addition of compensation for loss of land; (5) reconstruction of the lost structure or reestablishment of agricultural lands in consultation with community and restoration of their functions; and (6) cash indemnity of net income for months of business stoppage.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Villegas,Jorge E.

Georgia - Transmission Grid Stretching Project : Resettlement Plan (Vol. 6) : Resettlement action plan for construction of Akhaltsikhe-Batumi 220kv double circuit power transmission line - Segment II – Section II : km 7.7- km 40.8 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/186451496776813475/Resettlement-action-plan-for-construction-of-Akhaltsikhe-Batumi-220kv-double-circuit-power-transmission-line-Segment-II-Section-II-km-7-7-km-40-8