DETAILS
-
2017/07/25
-
Implementation Status and Results Report
-
ISR29067
-
1
-
1
-
2017/07/25
-
Disclosed
-
Peru - PE Mainstreaming inclusive design and universal mobility in Lima : P129561 - Implementation Status Results Report : Sequence 07
-
Universal Mobility
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 154
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Darido,Georges Bianco.
Peru - PE Mainstreaming inclusive design and universal mobility in Lima : P129561 - Implementation Status Results Report : Sequence 07 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/192081501026343818