The project consists of three components: (i) provision of $25 million to meet part of IDBI's requirements for financing of the import component of specific industrial projects aimed at producing for export or located in less-developed regions; (ii) provision of $5 million to help finance imported equipment, materials and consultants' services estimated at 25 man-months required for: (a) strengthening the Government's capacity to appraise and supervise industrial R&D projects; (b) establishment of a basic R&D facility for the Negev R&D Authority; and (c) five R&D subprojects to develop a prototype non-convecting pond to collect and store solar energy; commercial cultivation of the jojoba bean and a family of commercial waxes derived from it; a telephone system for communities of between 100 and 400 subscribers; a family of engines compatible with a variety of energy sources; and a high-performance tomographic scanner; (iii) provision of $5 million to help finance expansion of: (a) three technician/practical engineering institutes; and (b) four vocational training centers.
Details
-
Document Date
1975/05/31
-
Document Type
Memorandum & Recommendation of the President
-
Report Number
P1626
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2010/06/24
-
Disclosure Status
Disclosed
-
Doc Name
Israel - Industrial Development Project
-
Keywords
Engineering education; Engines; Financial institutions; Industrial research; Industry; Laboratories; Projects; Solar energy; Technical education; Technical schools; Telephone services; Vocational training
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Israel - Industrial Development Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/194551468253248245/Israel-Industrial-Development-Project