Doc Name
Indonesia - Indonesia Power Transmission Development
-
Keywords
Land Acquisition and Resettlement; financial internal rate of return; Economic Internal Rate of Return; Debt Service Coverage Ratio; electric power supply; worker health and safety; Environmental and Social Impact; transmission and distribution system; power transmission system; physical cultural resources; construction and operation; theory of change; availability of electricity; achievement of outcome; net present value; annual electricity growth; Social Impact Assessment; public-private partnership; public private partnership; environmental safeguard policy; kv transmission line; amount of electricity; demand for energy; personal protective equipment; infrastructure project development; Development Policy Lending; demand for electricity; entry rate; national power utility; kv substation; contract management; electricity sale; transmission network; Indigenous Peoples; internal process; natural habitat; outcome targets; intermediate outcome; project costing; transmission capacity
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
IEG Review Team
Indonesia - Indonesia Power Transmission Development (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/201911608755401615/Indonesia-Indonesia-Power-Transmission-Development