Details
-
Author
-
Document Date
2021/06/28
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR47151
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2021/06/28
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Electricity Access Expansion Project - P153743 - Sequence No : 11
-
Keywords
electricity access; Access to Electricity; number of household connections; rural area; distribution line; vocational training center; Investment Project Financing; female-headed household; electricity connection; construction work; capacity strengthening; initial funding; supply capacity; electricity sector; financial model; result indicator; civil society; direct beneficiaries; transmission line; delay in procurement; average household; operation risk; risk category; new connections; electricity service; electricity system
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Biaou,Affouda Leon
Disclosable Version of the ISR - Electricity Access Expansion Project - P153743 - Sequence No : 11 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/204781624900109364/Disclosable-Version-of-the-ISR-Electricity-Access-Expansion-Project-P153743-Sequence-No-11