Details
-
Author
-
Document Date
2020/06/27
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR42185
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/06/27
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - PE Optimization of Lima Water and Sewerage Systems - P117293 - Sequence No : 18
-
Keywords
rehabilitation of water; reliability of water supply; sewerage network; number of water; state of emergency; water supply network; Investment Project Financing; Sanitation Services; water pipe; water saving; rational water; Water Services; civil works; sewerage system; several consultancies; operation risk; future demand; household water; water global; surface finishing; risk category
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Marmanillo,Iris
Disclosable Version of the ISR - PE Optimization of Lima Water and Sewerage Systems - P117293 - Sequence No : 18 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/216121593290272875/Disclosable-Version-of-the-ISR-PE-Optimization-of-Lima-Water-and-Sewerage-Systems-P117293-Sequence-No-18