Skip to Main Navigation

Revised Summary of Financial Intermediairies Environmental and Social Management System (ESMS) China Renewable Energy and Battery Storage Promotion Project (P163679) (English)

Details

  • Author

    Borrowing Agency

  • Document Date

    2021/05/27

  • Document Type

    Environmental and Social Management Plan

  • Volume No

    1

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2021/05/27

  • Disclosure Status

    Disclosed

  • Doc Name

    Revised Summary of Financial Intermediairies Environmental and Social Management System (ESMS) China Renewable Energy and Battery Storage Promotion Project (P163679)

  • Keywords

    energy storage; Free, Prior and Informed Consent; environmental and social management; Environmental and Social Performance; Environmental and Social Impact; power transmission and distribution; community health and safety; domestic natural gas production; energy storage facilities; power plant site; Energy Storage Battery; work safety; energy storage capacity; industrial pollution control; production of hydrogen; social risk management; labor management; law and regulation; ethnic minority community; battery storage; environmental monitoring system; extended producer responsibility; high quality standard; traditional bank credit; access to grid; utilization of biomass; high tech company; construction and operation; fast economic growth; high growth rate; major energy source; energy storage technology; land management policy; controlling air pollution; environmental protection goal; power generation industry; cultural heritage site; waste disposal system; construction of facilities; biomass energy industry; impact of technology; nuclear power plant; rate of fire; power station; biomass gasification; power system; environmental risk; Wind Power; working condition; Ethnic Minorities; battery recycling; community safety; arable land; lead-acid battery; raw material; residential area; industrial park; institutional strengthening; flue gas; storage batteries; technical standard; critical habitat; innovative uses; eligibility criterion; policy study; organizational capacity; social implications; new technology; mitigation measure; market change; field visits; project financing; major type; environmental pollution; keystone species; installed capacity; frequency modulation; power supply; battery technology; energy transformation; agricultural land; heat storage; commercial zone; generation level; business training; Green Finance; financial resource; land use; annual production; energy security; stakeholder engagement; grid application; natural habitat; storage facility; site selection; cultural relic; remote area; environmental standard; consumption level; open market; large-scale production; regulatory system; market demand; new investor; reliable technology; cold storage; safety compliance; consumption system; clean gas; recycling technologies; ecological environment; total output; combustible material; livestock manure; proven technology; low toxicity; technical competence; selection criterion; new business; social requirement; safeguard issue; market survey; international energy; pricing policy; capital supply; pump storage; investment component; industrial sector; geographical distribution; price difference; innovative application; technology neutrality; unused land; construction site; management framework; soil improvement; microbial communities; organic matter; compost technology; waste water; energy department; impact analysis; pollutant emission; special provision; national policy; affected farmer; landless farmer; security policy; compensation law; across province; land owner; migration path; ancient sites; child labor; forced labor; disposal service; national regulation; human settlement; ancient buildings; ancient tomb; coal-fired power; other sectors; transmission efficiency; increasing consumption; adverse risks; local law; combustible gas; battery production; electronic device; safety management; environmental hazard; international certification; circular economy; international auditor; domestic authority; best practice; production facility; project risk; safety requirement; environmental supervision; business opportunity; automobile production; environmental compliance; lithium batteries; recycling center; risk profile; barren land; field observation; recycling facility; international standard; primary producer; electric vehicle; lending risk; security risk; Social Conflict; low risk; emergency response; prevention measures; land acquisition; transmission facility; cost of energy production; ecological protection

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Borrowing Agency

Revised Summary of Financial Intermediairies Environmental and Social Management System (ESMS) China Renewable Energy and Battery Storage Promotion Project (P163679) (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/218541622123015007/Revised-Summary-of-Financial-Intermediairies-Environmental-and-Social-Management-System-ESMS-China-Renewable-Energy-and-Battery-Storage-Promotion-Project-P163679