Details
-
Document Date
1999/08/13
-
Document Type
Implementation Completion Report Review
-
Report Number
ICRR10517
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2016/09/28
-
Disclosure Status
Disclosed
-
Doc Name
Bosnia-Herzegovina - Emergency Electric Power Reconstruction
-
Keywords
thermal power plant;hydropower plant;transmission and distribution;short period of time;kv transmission line;sector restructuring;coal mine;power sector restructuring;availability of fund;electric power network;hydro power station;power transformers;electricity service;electricity tariff;coal production;distribution network;kv substation;engineering service;project operation;financial gap;hydropower station;power system;utility vehicle;electricity sale;generation plant;borrower's performance;coal supply;electricity companies;cash operating;project financing;procurement monitoring;local contribution;transmission facility;transmission substations;transmission system;medium voltage;Investment strategies;distribution line;maintenance vehicles;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Bosnia-Herzegovina - Emergency Electric Power Reconstruction (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/229691475097816788/Bosnia-Herzegovina-Emergency-Electric-Power-Reconstruction