Skip to Main Navigation

West Bank and Gaza - Gaza Electricity Network Rehabilitation Project (English)

The additional financing for the Gaza Electricity Network Rehabilitation Project for West Bank and Gaza will finance the cost of scaling-up and restructuring of project activities to address urgent and significant needs. Specifically, it would finance reconstruction and rehabilitation of electricity network infrastructure that has been extensively damaged as a result of hostilities in Gaza during the period of July 5 to August 26, 2014. The AF is requested by the Palestinian Energy and Natural Resources Authority (PENRA) in association with the Gaza Electricity Distribution Company (GEDCO). The AF will finance supply and installation of electricity distribution infrastructure, and associated implementation costs, in order to (i) reconstruct damaged electricity infrastructure and restore basic electricity services; (ii) strengthen the existing network and improve supply in areas where population movement has increased load; (iii) re-establish and improve revenue collections for electricity; and (iv) restore and enhance the capacity of PENRA and GEDCO to deliver electricity services.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

West Bank and Gaza - Gaza Electricity Network Rehabilitation Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/229741468328841547/West-Bank-and-Gaza-Gaza-Electricity-Network-Rehabilitation-Project