Skip to Main Navigation

Monthly Operational Summary of Bank and IDA Proposed Projects (as of May 31, 1975) (English)

The Bank established a specific policy and procedures for environmental assessment and related environmental analyses of International Bank for Reconstruction and Development (IBRD) ) and International Development Association (IDA) lending operations. Under this environmental assessment process, the type, timing, and main issues of environmental analysis to be performed by the borrower are to be confirmed at the time that a given lending operation is initiated into the Banks prospective lending program and thereafter reported and updated on a quarterly basis in the monthly operational summary. This report focuses on the monthly operational summary of Bank as of May 1975.

Details

  • Document Date

    1975/06/23

  • Document Type

    Monthly Operational Summary

  • Report Number

    146402

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    World,

  • Region

    The World Region,

  • Disclosure Date

    2020/06/06

  • Disclosure Status

    Disclosed

  • Doc Name

    Monthly Operational Summary of Bank and IDA Proposed Projects (as of May 31, 1975)

  • Keywords

    integrated rural development; water supply and sewerage; project costing; Irrigation and Drainage Canals; rural water supply facilities; Vocational and Technical Training; school drop-outs; transmission and distribution network; improvement of water supply; primary education for child; National Food and Nutrition; foreign exchange; water supply system; interest during construction; provision of credit; hydroelectric power plant; prequalification of bidders; provision of equipment; potable water supply; rural primary school; control of weed; water treatment plant; rural extension service; industrial water supply; amount of loan; water supply works; flat steel mill; sites and services; completion of appraisal; working capital requirements; hydro power potential; secondary technical education; fruit and vegetable; credit farmer; expansion of transmission; Production of Crops; natural gas transmission; adult literacy program; water and sewerage; community water system; improvement of road; quality and efficiency; agricultural product exports; long term credit; restructuring of industry; land use capability; information and communication; food crop production; credit extension service; soil conservation technique; financing of investment; improvement of education; phosphate rock mining; domestic water supply; exploitation of resource; access road program; central water authority; equipment and supply; vocational training center; production of maize; qualification of contractor; child health care; development of infrastructure; land reform beneficiary; thermal power station; medium term credit; fish processing plant; construction of road; rural teacher training; production of livestock; oil palm plantations; appraisal mission; retroactive financing; civil works; project identification; preparation mission; rural area; transmission line; land settlement; credit program; small industry; marketing facility; investment program; storage facility; port facility; integrated development; sewerage facilities; Power Generation; urban development; first stage; pumping station; parallel financing; financing plan; Financing plans; highway maintenance; irrigation scheme; fishing port; transport planning; small farm; financial problem; Health Service; small farmer; coffee production; health facility; industrial enterprise; engineering study; external source; market gardening; farm input; process plant; paper production; livestock producer; finance company; credit line; maintenance equipment; port equipment; cane production; consulting service; construction work; Consulting services; joint financing; house connection; pollution control; dairy development; water pollution; domestic airport; flood control; highway network; foreign expenditure; new town; national training; industrial sector; communications equipment; planting season; urban sector; agricultural lending; sugar mill; navigational aid; traditional herd; Rural Industry; social infrastructure; rural affairs; process industry; agricultural productivity; steel plant; garment production; long-term financing; telecommunication facilities; technical proposal; land clearing; coastal region; tile drainage; mortgage bank; Water Demand; project finance; pulp industry; small-scale enterprise; reconnaissance mission; national investment; treatment facilities; education mission; major port; shrimp trawler; wood processing; future demand; irrigation supply; government site; medium mining; distribution facility; agricultural process; export industry; income household; hardwood forests; cotton production; agricultural education; train activity; food fortification; government proposal; thermal generation; pumping system; water resource; rolling stock; sugar production; industrial equipment; rural community; forestry resource; small cities; national railway; industry credit; Community Services; financial rehabilitation; industrial financing; road improvement; recreational facility; liquid cargo; rural healt

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Monthly Operational Summary of Bank and IDA Proposed Projects (as of May 31, 1975) (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/231271591492182707/Monthly-Operational-Summary-of-Bank-and-IDA-Proposed-Projects-as-of-May-31-1975