Details
-
Document Date
2013/11/18
-
Document Type
Implementation Completion Report Review
-
Report Number
ICRR13782
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2016/09/23
-
Disclosure Status
Disclosed
-
Doc Name
China - Second Beijing Environment Project
-
Keywords
heating energy;wastewater collection and treatment;achievement of development outcome;Energy & Environment;Land Acquisition and Resettlement;waste water treatment plant;total number of people;natural gas boiler;quality at entry;water pollution;water quality monitoring;air quality improvement;cost of gas;quality of supervision;air pollution reduction;wastewater treatment plant;private sector leadership;cost of wastewater;wastewater service provision;collection of wastewater;natural gas use;air quality target;repository of information;decision support system;procurement of equipment;standard of living;disposal of sludge;transfer of technology;greenhouse gas emission;emergency response plan;adverse environmental impact;water scarce area;environmental safeguard policy;construction of sewer;flood protection standard;protection of groundwater;Solid Waste Management;high energy consumption;urban infrastructure sector;promoting energy efficiency;surface water quality;Promoting Private Sector;portion of total;gas distribution infrastructure;technological development;Water Resource Management;promotion of energy;district heating system;environmental management policy;secondary wastewater treatment;sewage treatment systems;heat supply system;carbon development;air pollution control;air quality reports;environmental protection measures;cost of land;procurement of work;wastewater component;wastewater sector;outcome indicator;project costing;intermediate outcome;interceptor sewer;gas technology;water environment;reclaimed water;Bank Policies;energy conservation;results framework;institutional model;treatment facilities;insufficient information;municipal government;utility management;flood damage;market development;cost-effectiveness analysis;management capacity;residential consumer;air pollutant;ambient concentration;river system;resettlement implementation;Technology Transfer;government entity;commercial operation;Power Generation;coal consumption;catalytic effect;transfer station;demonstration plant;land area;wastewater operation;noise control;construction site;support policy;quality rating;environmental pollution;dust control;continuing training;monitoring indicator;international consultant;health warning;resource center;satisfactory manner;generally well;capacity strengthening;fire systems;capacity enhancement;tariff rate;environment issues;environment protection;contract management;construction management;external monitor;field visits;safeguard issue;entry rate;Environmental Assessment;Project Monitoring;sell gas;monitoring stations;institutional strengthening;analytical capacity;international expert;advanced technology;sewage collection;comparative cost;outcome targets;legal instrument;increased supply;urban development;environmental health;municipal energy;radiant heating;wastewater element;business model;energy audits;boiler owner;environmental cost;technology development;quantitative targets;output level;wastewater investment;wastewater system;market capacity;conservation measure;pollution source;cleaner energy;institutional framework;river water;heat meter;energy auditing;river channel;heat delivery;land price;efficiency improvement;monitoring information;wastewater pollution;Advisory services;civil works;rehabilitation component;appraisal costs;cost data;environmental component;project financing;business planning;treated wastewater;managerial capacity;heat units;commercial company;resettlement issue;environmental standard;sulphur dioxide;river dredging;environmental challenge;municipal priority;rational use;wastewater tariff;full participation;pollution emission;affected persons;automobile emission;social safeguard;carbon dioxide;Cash Transfer;adequate water;procurement activities;power system;procurement capacity;environmental monitoring;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
China - Second Beijing Environment Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/245801474633104267/China-Second-Beijing-Environment-Project