Skip to Main Navigation

India - Mumbai Urban Transport Project-2A : P113028 - Implementation Status Results Report : Sequence 14 (English)

Details

  • Author

    Agarwal,Atul

  • Document Date

    2016/03/29

  • Document Type

    Implementation Status and Results Report

  • Report Number

    ISR23031

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    India,

  • Region

    South Asia,

  • Doc Name

    India - Mumbai Urban Transport Project-2A : P113028 - Implementation Status Results Report : Sequence 14

  • Keywords

    trains per hour;journey time;Transport and ICT;suburban rail system;urban transport;iso 14001;fleet size;power supply;investment loan;reduction measure;operational efficiency;construction activities;rolling stock;passenger survey;counterpart fund;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Agarwal,Atul

India - Mumbai Urban Transport Project-2A : P113028 - Implementation Status Results Report : Sequence 14 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/250961468251168646/India-Mumbai-Urban-Transport-Project-2A-P113028-Implementation-Status-Results-Report-Sequence-14