Skip to Main Navigation

Cameroon - Rural Electricity Access Project for Underserved Regions Project (English)

The development objective of the Rural Electricity Access Project for Underserved Regions Project for Cameroon is to increase electricity access in underserved regions of Cameroon. The project comprises of five components. The first component, rural electrification by grid extension consists of two sub-components: (i) rural electrification by extension of medium voltage and low voltage (MV and LV) networks; and (ii) reinforcements and extension of existing High Voltage Level B and High Voltage Level A and Low Voltage Level A (HTB and HTA and BTA) networks to enhance the security of power supply to new villages in far-north regions. The second component, decentralized rural electrification is based on two concepts: (a) a public-private partnership (PPP) concept where the private sector, including energy of Cameroon (ENEO), will play a role as operator and not direct investor, and (b) securing supply of existing isolated mini-grids operated by ENEO in selected localities by hybridization, namely, adding photovoltaic (PV) solar mini-plants and extension of the existing HT and /BTA networks for better service coverage. It consists of two sub-components: (i) development of a pilot PPP for decentralized rural electrification; and (ii) securing the power supply of isolated sites by hybridization. The third component, support to households for connection costs will support the establishment of a revolving fund to help finance initial household connection costs (including ready boards) to obtain grid supply in the 417 localities (targeted under sub-component 1.1 and component 2) and in approximately 12 localities that are already electrified. The fourth component, strengthening institutional capacity of electricity sector and project management will support capacity building of implementing agencies and entities and project management. It consists of six sub-components: (i) strengthening institutional capacity of the electricity sector; (ii) owner’s engineer for project supervision; (iii) structuring: (a) an industrial strategy built on rural electrification activities, and (b) local expertise for engineering, construction, and maintenance of HTA and BTA networks; (iv) income generation and capacity building for women and youth; (v) support to institutional reform of the rural electrification agency (AER); and (vi) project management support. The fifth component, contingent emergency response will be available if needed, to redeploy some of the project resources alongside those of other projects in the Cameroon project portfolio to respond to crisis and emergency needs.

Details

  • Document Date

    2018/11/20

  • Document Type

    Project Appraisal Document

  • Report Number

    PAD2677

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Cameroon,

  • Region

    Africa,

  • Disclosure Date

    2019/05/07

  • Disclosure Status

    Disclosed

  • Board Meeting Date

    2018-12-13T00:00:00Z

  • Doc Name

    Cameroon - Rural Electricity Access Project for Underserved Regions Project

  • Keywords

    Infant and Maternal Mortality Rates; Access to Electricity; transmission and distribution network; islamic development bank; Grievance Redress Service; Environmental and Social Impact; promotion of gender equality; equal access to education; access to health service; total number of people; policy and structural reform; Fragility, Conflict, and Violence; vulnerability to climate change; generation capacity; decentralized rural electrification; rural area; grid extension; risk of debt; heavy fuel oil; revenue cap regulation; gross domestic product; electricity access; political risk insurance; per capita income; international commodity price; risk category; average coverage rate; electricity coverage rate; long-term climate change; loss of livestock; social services delivery; Poverty & Inequality; global financial crisis; capacity for implementation; distribution and transmission; investments in infrastructure; rural electrification program; long-term energy security; cost of service; development of infrastructure; Finance for Development; Letter of Credit; evidence of payment; bill of lading; earnings before interest; Exchange Rates; development of hydropower; Corporate Results Indicator; households with connection; electricity generation capacity; inclusive economic growth; value added tax; supply of electricity; independent power producer; electricity supply service; availability of electricity; institutional framework; transmission network; operational performance; electricity sector; Energy Sector; Public-Private Partnership; price cap; regional inequality; financial sustainability; peak demand; avoided costs; transmission investment; installed capacity; water storage; tariff regime; paramilitary purpose; increased access; Business Climate; electricity consumer; direct beneficiaries; extreme poverty; hydropower plant; syndicated loan; results framework; Gender Gap; electricity service; adjustment measure; external balance; Clean Energy; electricity transmission; macro stability; system operator; common currency; energy exporter; power utility; domestic supply; Energy Projects; power utilities; generating capacity; affordable energy; large hydropower; hydropower development; price stability; bilateral trade; sovereign debt; medium voltage; grid system; oil revenue; power energy; private entity; debt-service payment; fiscal pressure; public debt; Power Generation; equity stake; Power Policy; enhancing women; Export Diversification; Financial Sector; commercial capital; private finance; Hydro Power; Women Empowerment; equitable development; investment amount; Equal Opportunity; Employment Sector; development partner; project agreements; public life; Advisory services; distribution company; annual tariff; strategic partner; seasonal water; distribution activity; access gap; dam safety; agricultural diversification; Public Spending; Fiscal policies; fiscal policy; affordable electricity; industrial strategy; electrical system; transmission line; industrialized country; Industrialized countries; implementing policy; increase productivity; large-scale infrastructure; production cost; demand deficit; financial closure; supply constraint; high compliance; uniform tariff; investment cost; energy access; strategic objective; financial resource; productive industry; Emerging economies; emerging economy; project plan; Disaster Risk; poverty eradication; socioeconomic development; Effective Date; payment voucher; customs department; applied tariff; ineligible expenditures; Cash Income; electricity bill; rural family; information campaign; household income; inflation rate; lower-income household; Bank Policies; electrical power; result indicator; national electrification; geographical area; public lighting; power supply; distribution line; productive use; electrical grid; remote area; water pump; power cable; direct investor; secure supply; service coverage; sustainable energy; connection cost; support infrastructure; Labor Market

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Cameroon - Rural Electricity Access Project for Underserved Regions Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/260941545015657290/Cameroon-Rural-Electricity-Access-Project-for-Underserved-Regions-Project