Skip to Main Navigation

Integrated Safeguards Data Sheet (Appraisal Stage) - Zimbabwe National Water Project - P154861 (English)

Details

  • Author

    Viola,Chloe Oliver

  • Document Date

    2015/09/24

  • Document Type

    Integrated Safeguards Data Sheet

  • Report Number

    ISDSA15017

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Zimbabwe,

    Africa,

  • Region

    Africa,

  • Doc Name

    Integrated Safeguards Data Sheet (Appraisal Stage) - Zimbabwe National Water Project - P154861

  • Keywords

    occupational safety and health management system;degradation of critical natural habitats;investment in water supply;Environmental and Social Safeguard;water allocation and management;Environmental and Social Impact;water supply scheme;raw water source;water quality management;physical cultural resources;international water course;water treatment plant;sources of water;domestic water supply;dam safety reports;water distribution network;HIV and AIDS;international good practice;water service provision;South-South Learning Exchange;access to water;wastewater treatment system;number of beneficiaries;supply of good;national water resource;water resource regulation;water and wastewater;Investment Project Financing;bachelor of science;rehabilitation of water;response to crisis;long term investment;water quality monitoring;environmentally suitable sites;climate change model;rural water supply;public information center;waste stabilization ponds;potentials for community;improved water supply;Safeguard Policies;safeguard policy;citizen engagement;riparian state;safeguard issue;land development;transmission main;sanitation needs;sanitation improvement;river system;abstraction rate;international watercourse;institutional strengthening;involuntary resettlement;Water Services;commercial service;water abstraction;project intervention;regulatory authority;watershed catchment;downstream flow;Sanitation Services;project costing;Proposed Investment;shared water;civil works;traditional leaders;negative effect;dam capacity;water sector;pollution impact;positive impact;target water;cumulative impact;community mobilization;fetching water;temporary structures;Environmental Assessment;sanitation assessment;local operator;small-scale irrigation;competent authority;aquatic life;Water Policy;supply water;project's impact;water committee;water main;weed management;safeguards compliance;aquatic weed;sanitation promotion;water intake;precautionary measure;financial situation;water transmission;stakeholder management;commercial orientation;gap analysis;human habitation;private property;irreversible impacts;domestic institution;water pollution;mitigation measure;public awareness;local ngo;safeguards data;citizen perceptions;pipeline installation;local leadership;effluent discharge;government institution;safeguard specialist;complaints handling;road map;natural science;Forest Management;sensitive ecosystems;wooded area;natural vegetation;pipeline route;road right;inlet pipe;stakeholder involvement;minimal impact;womens group;target beneficiary;monitoring process;state enterprises;meter installation;catchment level;procurement process;project accounting;special account;acceptable standard;monitoring progress;institutional inadequacy;legislative amendment;government entity;financial plan;utility management;municipal council;regulatory process;monopoly position;financing source;physical expansion;institution building;municipal governance;institutional mechanism;surface water;gender strategy;spatial distribution;tariff adjustment;safe water;water production;water catchment;safeguard analysis;protected area;aquatic habitat;catchment council;environmental use;irrigation water;catchment boundaries;conservation priority;physical characteristic;monthly reports;future investment;environmental criterion;site selection;ecological assessment;stakeholder consultation;vulnerable group;existing dam;distribution area;climatic variability;residential area;reconstruction fund;Water Demand;water infrastructure;investment need;environmental consideration;environmental flow;septic tank;public roadway;public safety;accommodation facility;chemical dosing;emergency preparedness;storage tank;sedimentation tanks;water user;sanitation system;Water Shortage;stakeholder engagement;effluent treatment;field visits;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Viola,Chloe Oliver

Integrated Safeguards Data Sheet (Appraisal Stage) - Zimbabwe National Water Project - P154861 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/262151468193145964/Integrated-Safeguards-Data-Sheet-Appraisal-Stage-Zimbabwe-National-Water-Project-P154861