Details
-
Document Date
2008/03/17
-
Document Type
Project Information Document
-
Report Number
AB3372
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2010/07/01
-
Disclosure Status
Disclosed
-
Doc Name
Burundi - Multi-Sector Infrastructure Project
-
Keywords
rehabilitation of transmission and distribution network;performance contract;access to water supply;preparation of bidding documents;electricity supply system;life expectancy at birth;water supply and sanitation;transmission and distribution system;reliability of water supply;physical cultural resources;adequate supply of water;large industrial consumer;water supply service;solar power system;consolidation of peace;promotion of energy;water treatment capacity;leak detection equipment;lack of investment;water and electricity;infant mortality rate;long term planning;basic water service;slow sand filter;continuity of service;conservation of water;delivery of service;availability of water;raw water intake;energy and water;alternative energy source;short term investment;water supply component;large consumer;thermal generation;allocation of fund;quality of supply;human capital;hydropower plant;electricity meters;power factor;pumping system;electricity grid;electricity component;loss reduction;efficiency improvement;involuntary resettlement;public awareness;production facility;peak power;awareness campaign;electricity service;incandescent bulb;local capacity;efficiency gain;Water Services;regulatory entity;household level;early detection;supply gap;information campaign;public consultation;bill recovery;demand management;hydropower capacity;commercial viability;financial sustainability;primary focus;electricity network;Safeguard Policies;budgetary resource;tariff regime;household connection;financial model;financing source;safeguard policy;business survey;natural habitat;Indigenous Peoples;improved sanitation;potable water;monitoring data;Consulting services;waste water;commercial practice;safe transportation;public entity;water use;government building;accounting practice;operational management;energy conservation;supply side;satisfactory manner;household survey;Urban Planning;water component;household consumers;financial deficit;Wind Power;capacity strengthening;credit instrument;pumping rate;appraisal mission;water level;pumping station;generation capacity;energy need;water flow;leakage reduction;national grid;agricultural production;political progress;fiscal management;service coverage;social stability;public health;operational capacity;treated water;rehabilitation need;total debt;long-term planning;improving governance;social indicator;grid supply;Micro Hydropower;demand growth;productive activity;land area;landlocked country;specific performance;competitive bidding;sectoral strategy;financial indicator;project negotiation;contractual relationship;engineering service;emergency repair;secondary distribution;public standposts;Sanitation Services;independent oversight;regulatory mechanism;water filtration;mutual debt;international consultant;consumption;improved service;small operator;sanitation practice;user preference;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Burundi-Multi-Sector Infrastructure Project : Burundi - Multi-Sector Infrastructure Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/272191468016841429/Burundi-Multi-Sector-Infrastructure-Project