Mozambique - Malawi Regional Interconnector Project : Environmental Assessment : Environmental and Social Impact Assessment for the Matambo Substation to the Border with Malawi (142 km) (English)

The development objective of the Malawi Regional Interconnector Project for Mozambique is to interconnect Malawi and Mozambique’s transmission systems and engage in bilateral and regional power trade in the Southern Africa power pool. Some of the negative impacts and mitigation measures include: (1) maintain equipment and machinery in good running condition, including brakes, mufflers and silencers, catalyzers and clean (power washed), free of leaks, excess oil, and grease to avoid temporary air quality deterioration; (2) restrict speed on loose surface roads to 20 km per hour during dry or dusty conditions and install signposts and road humps where relevant for safety and public health; (3) use water for dust suppression on stockpiles, exposed soils, and roads if dust generation is visible; (4) carefully select the landing area of falling trees to minimize damages to crops; (5) hazardous materials must be stored in a manner that prevents interaction with each other or with the environment or from being tampered with, accidentally; (6) restrict noise and vibration generating activities near residential or institutional sensitive receptors to the period considered as daytime (between 8 am and 5 pm) by World Health Organization (WHO) noise standards; (7) encourage the recruitment of female workers, with equal payment for male and female workers, for equivalent jobs; and (8) ensure the development of local and regional emergency plans in case of infrastructure breakdowns, especially near roads or residential areas.

Details

  • Author

    Mozambique

  • Document Date

    2019/05/01

  • Document Type

    Environmental Assessment

  • Report Number

    SFG5519

  • Volume No

    1

  • Total Volume(s)

    3

  • Country

    Africa,

  • Region

    Africa,

  • Disclosure Date

    2019/05/28

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental and Social Impact Assessment for the Matambo Substation to the Border with Malawi (142 km)

  • Keywords

    millenium challenge account; kv line; study area; Acquired Immune Deficiency Syndrome; environmental and social management; access to water supply; total number of individual; Information, Education and Communication; stated period of time; affected households; kv transmission line; invasive alien species; risk of contamination; risk of accident; construction and operation; power transmission line; loss of land; coal mine; surface water quality; construction work; aquatic habitat; Environmental Management Plan; loss of vegetation; Certificate of Ownership; health care access; dominant economic activity; emergency response plan; surface water runoff; average wind speed; industry and trade; waste management plan; identification of risks; supply of materials; species of mammal; consultation of stakeholders; species of reptiles; land use restriction; Access to Electricity; movement of vehicle; radio and television; species of amphibians; loss of crop; access to information; flora and fauna; cost of measures; provisioning ecosystem services; gross domestic product; geographic information system; dominant energy source; global positioning system; species of flora; Human Immunodeficiency Virus; mitigation measure; cumulative effect; vulnerable group; stakeholder engagement; positive impact; conservation interest; power line; Natural Resources; socio-economic survey; social component; species composition; flora communities; land resources; natural habitat; local resident; institutional framework; socioeconomic impact; social cohesion; red data; construction phase; cumulative impact; vibration level; child abuse; sexual abuse; built environment; storage area; farming activity; pastoral land; site preparation; field survey; water source; migratory species; interconnection agreement; chemical property; soil contamination; cubic metre; suspended solid; public meeting; technical feasibility; ethnic group; groundwater quality; critical habitat; community representative; affected communities; vulnerable species; permanent loss; household head; Mentally disabled; chronically ill; social term; Public Services; community health; sacred sites; steep slope; archaeological site; ecological impact; temporary employment; business opportunity; wet season; listed species; geologic framework; dry season; land parcel; international requirement; human environment; job opportunities; safety standard; job opportunity; public consultation; primary road; map library; consultation process; mining concession; customary authorities; vegetation loss; natural environment; ecological integrity; affected districts; biophysical environment; timber production; noise source; riparian area; high employment; employment rate; construction activities; road traffic; bird community; bird habitat; herbaceous species; invasive species; mother tongue; threatened species; habitat fragmentation; household affect; reptile species; informed participation; primary health; gender aspect; tertiary institution; erosion risk; indirect impact; energy need; inflation risk; deforestation rate; agricultural product; livestock rearing; customary land; soil compaction; cash crop; air pollutant; emission source; soil excavation; site operation; ambient noise; administrative structure; national legislation; resettlement process; soil classification; habitat status; construction schedule; social policies; social policy; investment value; geologic formation; site survey; noise level; contract agreement; energy legislation; legal framework; energy authority; land cover; administrative framework; operational budget; adaptive management; satellite image; safety management; worker health; seismic hazard; River basin; biodiversity areas; endemic species; migratory behaviour; sound level; bird sample; respiratory infection; bird migration; riverine forests; non-governmental organization; energy line; geological condition; health effect; seismic activity; co2 emission; relative humidity; wind rose

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Mozambique

Mozambique - Malawi Regional Interconnector Project : Environmental Assessment : Environmental and Social Impact Assessment for the Matambo Substation to the Border with Malawi (142 km) (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/275841559105418449/Environmental-and-Social-Impact-Assessment-for-the-Matambo-Substation-to-the-Border-with-Malawi-142-km