Skip to Main Navigation

Bangladesh - Fourth Dhaka Water Supply Project (English)

The basic objectives of the Fourth Dhaka Water Supply Project are: a) to commence an institutional reform program; b) to increase the life of existing assets and reduce water losses; c) strengthen water resources management; and d) to increase potable water supply. The project will include major elements as follows: a) institutional reform program; b) capacity additions and service extensions; c) loss reduction, sanitation and efficiency improvement activities; d) institutional development technical assistance; and e) project preparation and implementation support technical assistance.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Bangladesh - Fourth Dhaka Water Supply Project (English). World Development Sources, WDS 1996 Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/276541468768585181/Bangladesh-Fourth-Dhaka-Water-Supply-Project