Skip to Main Navigation

China - Zhejiang Urban Environment Project : environmental assessment executive summary (English)

Potential construction phase impacts are relatively minor and easily mitigated. These construction impacts have been sorted according to their geographic location within the overall project scheme. Details of mitigation measures, the monitoring required to ensure that mitigation measures are effectively implement, and responsibilities are provided in detailed charts. The potential operational phase impacts are relatively minor and easily mitigated. Many of the concerns have been addressed in the course of the design of the wastewater collection and wastewater treatment facilities. Details of mitigation measures, a programme for monitoring mitigation measures and responsibilities are provided in detailed charts. Mitigation and monitoring budget: the capital budgets prepared for all Environmental Assessment of the Zhejiang Urban Environment Project (ZUEP) component projects include allowances for necessary laboratory construction and equipment. Using this equipment to perform the necessary and required testing by the utility is also included in the operations budget for the project. Environmental strengthening is considered a critical component of the ZUEP project and a detailed Technical Assistance (TA) programme is being developed to address the needs. This includes training in management and operations for the PMOs and the utility companies, in a wide variety of disciplines.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China - Zhejiang Provincial Institute of Environmental Protection Science & Design

China - Zhejiang Urban Environment Project : environmental assessment executive summary (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/291011468746693724/China-Zhejiang-Urban-Environment-Project-environmental-assessment-executive-summary