DETAILS
-
2021/05/01
-
Environmental Assessment
-
159722
-
6
-
2021/06/02
-
Disclosed
-
Actualisation de l’Etude d’Impact Environnemental et Social des Travaux de Rehabilitation et de Bitumage des Routes Regionales Numero 32 et Numero 6 d’un Lineaire de 96 Kilometres
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 288
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
TED Ingenieurs Conseils.
Western Africa - Lome-Ouagadougou-Niamey Economic Corridor Project : Environmental Assessment (Vol. 6 of 6) : Actualisation de l’Etude d’Impact Environnemental et Social des Travaux de Rehabilitation et de Bitumage des Routes Regionales Numero 32 et Numero 6 d’un Lineaire de 96 Kilometres (French). Western Africa : TED Ingenieurs Conseils. http://documents.worldbank.org/curated/en/291111622714126618