The Second Magat River Multipurpose Project is Package II of the Magat River Multipurpose Project Stage II which consists of the following four packages: Package I - consisting of preconstruction works (access roads, permanent camp, etc.), dam foundation grounding, drainage gallery tunneling and the river diversion tunnels, together with consulting services associated with these activities. Package II - consisting of all civil works for the main dam, and appurtenant structures, reservoir resettlement, installed mechanical equipment and consulting services. This Package is the subject of the present report and the proposed Bank loan. Package III - consisting of the civil works for the power component, together with the supply and installation of penstocks, turbines, generators, electrical and mechanical equipment and transmission lines. Package IV - consisting of construction of the Baligatan diversion dam and the civil works for irrigation development of 27,000 ha of currently rainfed land.
Details
-
Document Date
1978/04/30
-
Document Type
Memorandum & Recommendation of the President
-
Report Number
P2310
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2010/06/24
-
Disclosure Status
Disclosed
-
Doc Name
Philippines - Magat River Multipurpose - Stage Two - Project
-
Keywords
Cement; Dams; Diversion structures; Drainage systems; Electrical equipment; Equipment; Generators; Hydraulic structures; Irrigation systems; Rain fed areas; Reservoirs; Transmission lines; Tunnels; Turbines
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Philippines - Magat River Multipurpose - Stage Two - Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/303921468293424208/Philippines-Magat-River-Multipurpose-Stage-Two-Project