Details
-
Author
-
Document Date
2013/03/25
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR9390
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Botswana - Botswana - Morupule B Generation and Transmission Project : P112516 - Implementation Status Results Report : Sequence 07
-
Keywords
energy and water;Environmental and Social Safeguard;water supply infrastructure;alternative energy resource;operations and maintenance;number of accidents;electricity transmission;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Vucetic,Vladislav
Botswana - Botswana - Morupule B Generation and Transmission Project : P112516 - Implementation Status Results Report : Sequence 07 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/310281468215994312/Botswana-Botswana-Morupule-B-Generation-and-Transmission-Project-P112516-Implementation-Status-Results-Report-Sequence-07