Details
-
Author
-
Document Date
2014/06/09
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR15060
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2014/06/09
-
Disclosure Status
Disclosed
-
Doc Name
West Bank and Gaza - Northern Gaza Emergency Sewage Treatment (NGEST) Project : P074595 - Implementation Status Results Report : Sequence 21
-
Keywords
Partnership for Infrastructure Development;Environmental and Social Impact Assessment;treatment plant;cubic meters per day;cubic meters of wastewater;emergency recovery loan;international contractor;sewage treatment plant;supply of electricity;wastewater treatment plant;pumping station;remedial work;infiltration ponds;Environmental Safety;transfer facility;operations and maintenance;increase in quantity;treatment of wastewater;delivery of good;renewable energy source;legal advisory service;notice of intention;sewerage treatment plant;pollution load;result indicator;treated wastewater;area population;insolvency case;pressure pipe;original work;operational management;water quality;civil works;electrical work;physical work;legal advice;insolvency matter;irrigation water;agricultural land;long-term impact;fuel shortage;ventilation system;special financing;effluent ponds;short notice;surrounding community;financial agreement;transfer scheme;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Rammal,Iyad
West Bank and Gaza - Northern Gaza Emergency Sewage Treatment (NGEST) Project : P074595 - Implementation Status Results Report : Sequence 21 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/313801468142489560/West-Bank-and-Gaza-Northern-Gaza-Emergency-Sewage-Treatment-NGEST-Project-P074595-Implementation-Status-Results-Report-Sequence-21