China - Poyang Lake Basin Town Water Environment Management Project : environmental assessment (Vol. 4) : Environmental management plan of Fengxin (English)

The development objective of Poyang Lake Basin Town Water Environment Management Project for China is to improve the environment of the Duchang Poyang Lake basin and nearby areas, and promote the balanced economic, social and ecological development of the project area. Some of the negative impacts and mitigation measures include: (i) garbage transfer stations shall get close to main roads for the purpose of easy entry and exit of waste transporters; (ii) the wastewater collection system shall meet such requirements as corrosion resistance and leakage prevention; (iii) warning board shall be placed at the entrance of each construction section, each crossroad, each road turn, each change of traffic lane, and each entrance of traffic aisle to inform people of entrance into construction area, and of traffic restrictions such as speed limit, height limit, etc.; (iv) never remove construction curb fender before the road construction takes interim passing measures or the engineering is completed; (v) emergency treatment facilities of residual water include accidental water storage pool, agent-feeding facilities for emergencies, etc.; (vi) for the sake of reducing water and soil erosion, fences should be set up around the dumping area on the wasteland of Guling mountain, Wangdun village; and (vii) waste collection boxes and cleared and transported by the environment and sanitation department to Yugan waste landfill for further treatment.

Details

  • Author

    Xie,Dan

  • Document Date

    2016/09/09

  • Document Type

    Environmental Assessment

  • Report Number

    SFG2445

  • Volume No

    4

  • Total Volume(s)

    8

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2016/09/09

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental management plan of Fengxin

  • Keywords

    school construction;Land Acquisition and Resettlement;environmental protection measures;environmental supervision;surface water quality standard;adverse environmental impact;construction site;law and regulation;water conservation measures;construction period;construction and operation;sewage pumping station;environmental monitoring;contractors and construction;environment and sanitation;public health education;noise control measure;environmental protection department;forest land cover;resettlement action plan;direction of traffic;traffic management plan;temporary storage area;institutional capacity building;ambient air quality;noise emission standard;water quality management;environmental protection law;environmental impact evaluation;environmental environmental;environmental safeguard policy;scientific research institute;water and electricity;environmental protection specialists;construction area;heavy metal;project construction;construction activities;environmental specialist;target water;urban roads;water bodies;mitigation measure;residual water;environmental issue;environmental pollution;irrigation water;residential area;soil erosion;local resident;acoustic environment;road administration;water temperature;sludge use;Traffic Safety;total nitrogen;monitoring cost;environmental managers;arable land;warning signs;Public Facilities;wild animal;drainage channel;environment protection;water intake;body function;feedback mechanism;water content;sensitive issues;public complaint;local condition;domestic sewage;national environmental;noise reduction;rush hour;engineering analysis;vehicle transport;evaluation standard;day school;channel dredging;mechanical equipment;construction time;license regulations;traffic road;construction management;waste transfer;water system;poverty group;support measure;environmental standard;treatment plant;cross contamination;environmental reporting;steel plates;dynamic environmental;retaining wall;scientific basis;environment management;preferential payment;bus line;epidemic control;Electric Power;living condition;organization design;land area;compensation plan;local policy;working day;telephone line;traffic problem;construction road;environmental cost;responsible person;protection requirement;important component;public security;dry season;afforestation rate;dump site;monitoring data;traffic rule;wild flora;pedestrian shortcut;dust pollution;seat belt;noise monitoring;noise pollution;storage space;environmental measure;management agencies;traffic measure;Dry land;dry sludge;water table;risk evaluation;Water 3;atmospheric pollutant;pipeline network;facility maintenance;environment construction;water drainage;underground water;recreational water;community noise;power supply;contract clause;policy requirement;Water Demand;Environmental Assessment;environmental benefit;sewage works;environmental requirement;routine monitoring;site selection;aquatic organism;project impact;management mechanism;land use;fuel gas;job opportunities;foundation construction;speed limit;job opportunity;external monitoring;organic matter;routine testing;security safeguards;participatory activity;construction supervision;technical expert;water volume;water environment;carbon monoxide;wastewater treatment;carbon dioxide;counterpart funding;chemical addition;water pollution;water monitoring;land occupation;solid pollutants;waste collection;traffic restriction;traffic lane;local situation;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Xie,Dan

China - Poyang Lake Basin Town Water Environment Management Project : environmental assessment (Vol. 4) : Environmental management plan of Fengxin (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/314291473837485501/Environmental-management-plan-of-Fengxin