DETAILS
-
2021/09/23
-
Implementation Status and Results Report
-
ISR48260
-
1
-
1
-
2021/09/23
-
Disclosed
-
Disclosable Version of the ISR - Second Urban Infrastructure Project - P132386 - Sequence No : 14
-
Urban Infrastructure; Institutional Strengthening and Capacity Building; solid waste service; coverage ratio; quality of wastewater; waste water treat; industrial solid waste; municipal waste disposal; Investment Project Financing; quality and efficiency; improved water supply; number of water; pollution load; treatment plant; benchmark system; budget allocation; utility company; capital expenditure; operation risk; risk category; ghg emissions;... See More
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 110
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.