Skip to Main Navigation

Brazil - NW Region Development Program (First Phase) Highway Project (English)

Details

  • Document Date

    1991/04/15

  • Document Type

    Project Completion Report

  • Report Number

    9504

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Brazil,

  • Region

    Latin America & Caribbean,

  • Disclosure Date

    2010/06/18

  • Disclosure Status

    Disclosed

  • Doc Name

    Brazil - NW Region Development Program (First Phase) Highway Project

  • Keywords

    feeder road program;Project Preparation and Appraisal;vehicle operating cost;constant local currency;requests for disbursement;improvement of road;feeder roads component;cost sharing arrangement;volume of traffic;high traffic volume;average daily traffic;regional development program;urban bank;increase in population;lack of action;effective monitoring system;net present value;zone of influence;bank supervision missions;agricultural production;axle load;road component;transport cost;access road;surface treatment;environmental issue;remedial action;qualitative assessment;highway construction;agricultural settlement;shoulder width;corrective action;land settlement;road administration;land institute;state road;civil works;project road;preventive maintenance;environment agency;ecological station;biological reserve;soil pollution;long-term viability;flood rehabilitation;road transport;borrower performance;dollar term;loan account;Consulting services;environmental consequence;loan covenant;payment delays;frontier area;institution building;environmental condition;external costs;adequate resources;traffic condition;federal road;appraisal mission;highway patrol;road maintenance;component area;municipal agencies;construction cost;urban work;road section;Social Welfare;future population;farm family;socio-economic development;disbursement rate;special grant;statistical information;loan disbursement;foreign exchange;procurement action;road connection;project execution;loan restrictions;maintenance equipment;financial problem;local funding;road work;state authority;loan condition;agricultural potential;financing system;adequate maintenance;construction loan;traffic counter;gravel surface;federal highway;road system;seasonal use;crop loss;weighing station;forecasted traffic;environmental aspect;rolling terrain;asphalt concrete;weight restriction;preparatory work;generally well;competitive atmosphere;firm action;good performance;large bank;forest exploitation;massive migration;program objectives;employment opportunities;employment opportunity;financial difficulties;environmental matters;total traffic;outstanding balance;finance highway;government action;counterpart fund;political commitment;highway engineer;construction component;agricultural output;conservative assumption;future traffic;limited information;productive sector;government's commitment;local partner;momentum gain;personnel change;bank's participation;integrated development;project costing;foreign consultant;bank participation;quantitative assessment;breeding ground;stagnant water;local traffic;regional population;municipal road;quantitative data;cattle ranching;agricultural purpose;supervision resource;Population Density;financial policies;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Brazil - NW Region Development Program (First Phase) Highway Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/319911468020724354/Brazil-NW-Region-Development-Program-First-Phase-Highway-Project