Details
-
Author
-
Document Date
2021/06/04
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR46636
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2021/06/04
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Central Sulawesi Rehabilitation and Reconstruction Project - P169403 - Sequence No : 04
-
Keywords
Public Facilities; safe housing; grievance redress mechanism; Investment Project Financing; slum upgrading; emergency response; health facility; operation risk; risk category; civil works; result indicator; building standard; sanitation system; resettlement sites; paved road; Property title; health clinic; health clinics; employment opportunities; employment opportunity; recovery activity
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Bald,Andre A.
Disclosable Version of the ISR - Central Sulawesi Rehabilitation and Reconstruction Project - P169403 - Sequence No : 04 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/338711622832085373/Disclosable-Version-of-the-ISR-Central-Sulawesi-Rehabilitation-and-Reconstruction-Project-P169403-Sequence-No-04