Details
-
Author
-
Document Date
2020/06/26
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR42276
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/06/26
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Power Efficiency and Reliability Improvement Project (PERIP) - P158249 - Sequence No : 06
-
Keywords
Investment Project Financing; transmission capacity; reliability improvement; organizational structure; operational practices; transmission line; risk category; operation risk; satisfactory manner; operational efficiency; electricity network; operational capacity; Energy
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Oguah,Samuel Kwesi Ewuah
Disclosable Version of the ISR - Power Efficiency and Reliability Improvement Project (PERIP) - P158249 - Sequence No : 06 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/340651593188874286/Disclosable-Version-of-the-ISR-Power-Efficiency-and-Reliability-Improvement-Project-PERIP-P158249-Sequence-No-06