Details
-
Author
-
Document Date
2018/02/01
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR31264
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2018/02/01
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Uganda Energy for Rural Transformation III - P133312 - Sequence No : 05
-
Keywords
Energy for Rural Transformation;Access to Electricity;amount of credit;installed capacity;Investment Project Financing;greenhouse gas emission;micro hydro power;rural water;rural health;pumping station;rural area;geothermal development;solar system;household connection;distribution line;electricity service;co2 emission;renewable source;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Elahi,Raihan
Disclosable Version of the ISR - Uganda Energy for Rural Transformation III - P133312 - Sequence No : 05 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/346941517495452171/Disclosable-Version-of-the-ISR-Uganda-Energy-for-Rural-Transformation-III-P133312-Sequence-No-05