China - Gansu Qingyang Urban Infrastructure Improvement Project (English)

The development objective of the Gansu Qingyang Urban Infrastructure Improvement Project for China is to assist Qingyang Municipality to improve selected urban infrastructure services including urban roads and urban environmental services. There are two components to the project. The first component is urban infrastructure improvements. This component includes the following subcomponents: 1) urban bypass. This sub-component includes (i) construction of bypass roads of the southern section of Xifeng's West Ring Road and the northern section of Xifeng's East Ring Road with installation of associated pipes; (ii) construction of three connection roads to the two bypass corridors of West Ring Road and East Ring Road; 2) integrated road corridor. This sub-component includes: (i) improvement of three selected main road corridors (Nan Bei Street, Anding Dong Xi Road, West Ring Road), including road pavement, traffic channelization, and lighting and greening, along with drainage and sewage system improvements; (ii) rehabilitation of three selected backstreets and small lanes for slow traffic (Nanyuan, Tianhe and Xifeng lanes); and (iii) carrying out, as part of the design of the integrated road corridor, the parking action plan, the public transport action plan, and the traffic safety, education and enforcement action plan; 3) drainage and sewage; and 4) wastewater treatment plant. The second component is institutional strengthening and capacity building. This component includes: provision of technical assistance for: (a) carrying out of a water resource study covering, among others, for water reuse, sub-basin water environment improvements and industrial wastewater discharge licenses in Xifeng District that supports the ongoing investments of wastewater management; (b) the improvement of the operation and maintenance capabilities of Qingyang Municipal Water Supply and Sewage Company (QWSSC) and Xifeng District's Public Utility and Transportation Bureaus in the provision of urban infrastructure services in the key sectors of drainage and wastewater, urban road transport; (c) capacity building and training for Qingyang Municipality's and Xifeng District's agencies involved in project implementation; and (d) strengthening of QWSSC's GIS-based system for the management of its drainage and wastewater pipes networks; and (e) strengthening the Qingyang Municipality's capacity for project management and construction supervision of the project.

Details

  • Document Date

    2012/04/30

  • Document Type

    Project Appraisal Document

  • Report Number

    66820

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2012/06/05

  • Disclosure Status

    Disclosed

  • Doc Name

    China - Gansu Qingyang Urban Infrastructure Improvement Project

  • Keywords

    waste water treatment plant;Land Acquisition and Resettlement;Risks and Mitigation Measures;economic and financial analysis;Urban Infrastructure;urban environmental service;wastewater treatment plant;physical cultural resources;main road corridor;accounting and reporting;safety for pedestrian;industrial wastewater discharge;urban road construction;improvement of road;Social Impact Analysis;public transport operator;financial management arrangement;urban road transport;market for water;construction and operation;cost of capital;international good practice;traffic management measure;comprehensive urban transport;User satisfaction Survey;travel time saving;development of capacity;government financial support;financial management capacity;urban environmental infrastructure;capital investment cost;loss of life;readiness for implementation;safeguard policy;Safeguard Policies;safety of dam;resettlement action plan;front end fee;net present value;urban infrastructure development;urban road space;social and environmental;urban transport service;regional development strategy;environmental safeguard policy;project affected persons;social security policy;social security program;resettlement and rehabilitation;local resettlement policy;urban master plan;public transport service;coastal city;water resource;urban roads;drainage;Capital Investments;bypass road;public consultation;coal resource;slow traffic;storm water;counterpart fund;financial statement;financial staff;pipe network;rush hour;engineering design;central city;urban districts;urban resident;sewage collection;water reuse;external investment;construction supervision;wastewater management;competitive city;traffic environment;severe shortage;rural county;competitive cities;industrial base;transport management;Procurement Policy;weighted average;wastewater pumping;bus stop;environmental benefit;sewage pump;rural resident;pumping station;road pavement;local resident;road safety;provincial territory;sewage system;sensitivity analysis;Public Transit;financial covenant;wastewater investment;journey time;financial sustainability;street light;wastewater pollution;institutional context;city core;road infrastructure;budget system;environmental challenge;sludge disposal;assessment rate;funding source;finance strategy;International Water;government budget;resource scarcity;user surveys;variance analysis;government appropriation;public parking;informant interviews;autonomous agency;rural area;rural settlement;treatment capacity;market institution;urban construction;focus group;pipe construction;land compensation;vulnerable group;road condition;oil tanker;road asset;social exclusion;soil erosion;funds flow;financial resource;freight traffic;institutional strengthening;investment climate;small stock;storm drainage;investment need;underdeveloped area;finance infrastructure;pollution reduction;legal opinion;Traffic Safety;Traffic Capacity;resettlement impacts;industrial area;sewage network;road access;trunk line;Investment priorities;health benefit;competitive bidding;rural-urban migration;public health;drainage pipe;small cities;construction programs;primary road;evaluation activity;adequate investment;road upgrade;road investment;limited water;cost-benefit analysis;traffic problem;efficient transport;qualified consultant;construction management;Technical Training;horizontal coordination;involuntary resettlement;Exchange Rates;investment priority;financial contribution;fiscal impact;indigenous people;sector managers;Indigenous Peoples;natural habitat;monitoring plan;grace period;approved budget;sectoral budget;religious activities;concerned parties;public transportation mode;transport mode;cumulative target;environmental monitoring;wastewater infrastructure;price contingency;street corridor;productivity increase;public meeting;compensation rate;entitlements policy;grievance procedure;accounting regulations;participation strategy;coastal provinces;environmental mitigation;transport specialist

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China - Gansu Qingyang Urban Infrastructure Improvement Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/351601468216572683/China-Gansu-Qingyang-Urban-Infrastructure-Improvement-Project