Skip to Main Navigation

Draft Environmental and Social Systems Assessment (ESSA) English version - Electricity Distribution Modernization Program - P174650 (English)

Details

  • Author

    Singh,Bipulendu Narayan

  • Document Date

    2021/10/25

  • Document Type

    Program-for-Results Environmental and Social Systems Assessment

  • Volume No

    1

  • Country

    Bangladesh,

  • Region

    South Asia,

  • Disclosure Date

    2021/10/25

  • Disclosure Status

    Disclosed

  • Doc Name

    Draft Environmental and Social Systems Assessment (ESSA) ? English version - Electricity Distribution Modernization Program - P174650

  • Keywords

    Electricity; Environmental and Social Management System; distribution line; Power Grid Company of Bangladesh; Occupational health and safety; legal and regulatory framework; drinking water quality standard; solar panel; grievance redress mechanism; million people; construction site; rural area; electricity distribution; civil works; child labor; stakeholder engagement; core principle; kv substation; private land; transmission and distribution; loss of crop; movement of vehicle; initial environmental examination; environmental clearance certificate; Grievance Redress Service; rural electrification program; solar panel supplier; distribution network; environmental pollution; tribal community; electricity connection; power generation capacity; Access to Electricity; inclusion of women; personal protective equipment; appropriate risk assessment; Production of Crops; vegetable and fruit; movement of people; quality of environment; social and environmental; household fuel expenditure; new employment opportunity; rural electric cooperative; safety of worker; management of forest; enforcement of regulation; adverse environmental impact; net present value; cost of electricity; construction and rehabilitation; reduction in emission; investment in electricity; independent power producer; private sector investor; private sector financing; use of electricity; standard operating procedure; quality of supply; human resource planning; department of environment; accountability for results; codes of practice; energy regulatory commission; construction of terminal; adverse environmental effect; disposal of batteries; discharge of wastewater; healthy working conditions; special economic zone; existing capacity; international development finance; providing water supply; fruit bearing trees; efficiency of electricity; put pressure; resettlement action plan; liquefied natural gas; Ownership Share Type; land acquisition; mitigation measure; tribal people; distributed energy; rooftop solar; kv line; meter reader; labor influx; negotiated settlement; legal framework; noise pollution; rural electricity; Contractual obligations; local market; power line; water bodies; modernization program; battery energy; water source; social system; power supply; informed consent; water course; water pollution; environmental standard; drug abuse; indigenous people; unskilled worker; land use; operational level; environmental benefit; environmental challenge; local farmer; storage system; battery storage; local law; water pump; road map; government land; network investment; geographical area; Indigenous Peoples; waste generation; prestressed concrete; contractual arrangement; buy back; construction phase; safe disposal; lead pollution; solar batteries; construction activities; local resident; electricity system; natural flow

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

Citation

Singh,Bipulendu Narayan

Draft Environmental and Social Systems Assessment (ESSA) English version - Electricity Distribution Modernization Program - P174650 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/352781635181560479/Draft-Environmental-and-Social-Systems-Assessment-ESSA-English-version-Electricity-Distribution-Modernization-Program-P174650