Skip to Main Navigation

China - Integrated Economic Development of Small Towns Project : environmental assessment (Vol. 9) : Guangdong small works at integrated economic development of small towns (Chinese)

The objective of the Integrated Economic Development of Small Towns Project for China is to promote sustainable economic development in selected towns of Gansu, Hunan and Guangdong provinces, creating conditions for increased employment, income generation and improved quality of life, by supporting public infrastructure development and strengthening the capacity of related institutions. Negative impacts include: waste water, solid wastes, noise pollution, waste gas, and sludge. Mitigation measures include: 1) oil leaked shall be recycled with buckets, poured into waste oil tanks after being collected with special buckets and hand over waste oil reclamation depot, and waste oil dropped on the earth shall be cleaned with cotton; 2) domestic waste shall be packed with bags, separately collected and be collective cleaned away by the environmental protection department for further disposal; 3) during construction, the operation time of construction equipment shall be properly arranged so as to avoid that lots of equipment with high noise may operated at the same time or at night; 4) safety management shall be conducted; 5) low-noise type of equipment shall be selected; and 6) sludge treatment shall be carry out in a minimization, stabilization and harmless manner, and sludge treatment facilities shall be planned constructed and put into operation at the same time with wastewater disposal facilities.

Details

  • Document Date

    2011/11/01

  • Document Type

    Environmental Assessment

  • Report Number

    E2930

  • Volume No

    9

  • Total Volume(s)

    14 (See all volumes)

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2012/01/17

  • Disclosure Status

    Disclosed

  • Doc Name

    Guangdong small works at integrated economic development of small towns

  • Keywords

    cultural relic;construction site;environment management;environment protection;construction and operation;construction period;construction area;construction work;Solid Waste Management;water pollution control;physical cultural resources;surface water body;technical training center;environment protection department;refuse disposal site;solid waste treatment;prevention and education;contractors and construction;surface water flow;quality and quantity;flora and fauna;domestic solid waste;air pollution control;environmental protection department;sectors of society;fugitive dust emissions;transportation of materials;prevention of accident;cost equipment;septic tank system;adverse weather conditions;local government regulation;cost of equipment;environment impact assessment;loss of water;noise control measure;land administration law;waste water;civil engineering;historic site;ecological environment;negative effect;construction material;construction road;dust control;speed restriction;construction time;project construction;pipe network;environment assessment;wild animal;electronic industry;safety management;flow chart;natural habitat;construction stage;wind direction;night construction;safety training;natural flow;inspection item;access road;domestic waste;water quality;national rules;construction equipment;hardware development;drainage ditch;domestic wastewater;wastewater discharge;sedimentation basin;land occupation;site protection;conservation experts;public security;air pollutant;native species;ecosystem restoration;clean vehicle;storage area;drainage channel;biological diversity;cultural site;preventive measure;dry season;water use;environment monitoring;reporting procedure;building material;low noise;national requirement;Provide Aid;business license;contaminated soil;protected area;city school;animal feeding;safeguard measure;polluted water;preservation zone;environment inspection;packaging material;allocation table;consulting service;culture conservation;on-site wastewater;industry cluster;treatment facilities;diesel oil;small Works;management experience;noise regulation;lead industry;capability building;Public Infrastructure;communication strategy;local public;security authority;saturated soil;natural reserve;heritage site;endangered species;cultural value;vegetation loss;site inspection;illegal hunting;personal behavior;internal management;construction accident;external supervision;demonstration effect;Business Policy;local safety;Infectious Disease;protective device;Consulting services;atmospheric pollution;public road;road transport;soil erosion;water bodies;fish pond;bus route;construction drawing;generate equipment;vehicular traffic;mechanical equipment;Nursing homes;vehicle transport;construction cost;inspection system;feedback mechanism;Filing Documents;accidental risk;management regulation;river regulation;remedial measure;construction activities;cultural property;domestic sewage;human life;native vegetation;construction machinery;worker camp;temporary storage;epidemic prevention;exhaust gas;construction supervision;local group;scientific basis;river course;Contractual obligations;water removal;bus stop;construction camp;living areas;accident prevention;gas emission;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China - Integrated Economic Development of Small Towns Project : environmental assessment (Vol. 9) : Guangdong small works at integrated economic development of small towns (Chinese). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/356581468239397613/Guangdong-small-works-at-integrated-economic-development-of-small-towns