Details
-
Author
-
Document Date
2020/09/25
-
Document Type
Environmental and Social Review Summary
-
Report Number
ESRSC01625
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/09/25
-
Disclosure Status
Disclosed
-
Doc Name
Concept Environmental and Social Review Summary (ESRS) - Sustainable Hydropower Development Project - P174327
-
Keywords
dam safety panel; community health and safety; transmission line; international good practice; institutional capacity building; social risk management; intangible cultural heritage; long term risk; main river system; Social Risk Rating; source of income; construction and operation; human capacity building; business support service; source income; grievance redress mechanism; safe working conditions; downstream investment; aquatic ecosystem; reservoir area; civil works; natural habitat; stakeholder engagement; critical habitat; environment risk; social impact; hydropower development; cumulative impact; energy specialist; land acquisition; Social Assessment; construction material; social plan; biological corridor; sustainable hydropower; social aspect; risk assessment; access road; stakeholder consultation; transmission network; ethnic group; biodiversity assessment; social issue; cultural environment; water pollutant; resettlement planning; ghg emissions; heavy equipment; ecosystem service; safety implication; vehicle traffic; labor influx; land use; worker camp; fish migration; general assessment; local stakeholder; Indigenous Peoples; Resource Efficiency; proactive engagement; adverse risks; environmental flow; Natural Resources; land holder; Cash Income; financial intermediaries; project risk; citrus fruit; international waterway; arable land; riparian state; Dry land; social policies; riparian issue; borrower's commitment; procurement process; consultancy service; socioeconomic development; hydropower generation; physical characteristic; project costing; project datum; far field; hydropower asset; indigenous community; indigenous communities; analytical tool; national policy; government law; mitigation plans; hydropower plant; installed capacity; social studies; social policy; social study; cultural practice; engineering design
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Draugelis,Gailius J.
Concept Environmental and Social Review Summary (ESRS) - Sustainable Hydropower Development Project - P174327 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/361341601061597360/Concept-Environmental-and-Social-Review-Summary-ESRS-Sustainable-Hydropower-Development-Project-P174327