Details
-
Author
-
Document Date
2011/02/12
-
Document Type
Implementation Status and Results Report
-
Volume No
1
-
Country
-
Region
-
Doc Name
Iraq - IQ - Emergency Road Rehabilitation : P087735 - Implementation Status Results Report : Sequence 12
-
Keywords
village access road;reduction in travel;road asset;road asset management;road asset management system;condition of road asset;river crossing;highway rehabilitation;rural access road;rural road network;Management Systems;management tool;rehabilitation program;road corridor;adequate maintenance;financial agreement;road maintenance;road section;floating bridge;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Dajani,Ibrahim Khalil
Iraq - IQ - Emergency Road Rehabilitation : P087735 - Implementation Status Results Report : Sequence 12 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/375521468771366056/Iraq-IQ-Emergency-Road-Rehabilitation-P087735-Implementation-Status-Results-Report-Sequence-12