Pakistan - First Phase of the Dasu Hydropower Project : Resettlement Plan : داسو ٹرانسمیشن لائن پروجیکٹ کے لئے دوبارہ آبادکاری ایکشن پلان : مختصر خلاصہ (Urdu)

The development objective of the First Phase of the Dasu Hydropower Project for Pakistan is to facilitate the expansion of electricity supply of hydro-power in Pakistan. Some of the negative impacts and mitigation measures include: (1) Pakistani rupee (PKR) 1,120,000 for each tower as compensation for the land taken for each tower. The amount may vary from on one tower to another due to location and a variety of other factors; (2) cash compensation at replacement rates for affected structure and other fixed assets free of salvageable materials, depreciation, and transaction costs; (3) crop compensation in cash at full market rate for one year (winter and summer seasons) for impacts caused by grid construction, tower base, stringing, and access roads; (4) for timber and wood trees, the compensation will be at market value of tree’s wood content; (5) in case of temporary loss, cash compensation equal to the period of the interruption of business up to a maximum of six months or covering the period of income loss based on construction activity; (6) community support program such as roads, clinic, market etc. to be built in consultation with the affected people during implementation; and (7) temporary or permanent employment during construction or operation, wherever feasible.

Details

  • Author

    Pakistan

  • Document Date

    2019/11/01

  • Document Type

    Resettlement Plan

  • Report Number

    SFG5872

  • Volume No

    1

  • Total Volume(s)

    4

  • Country

    Pakistan,

  • Region

    South Asia,

  • Disclosure Date

    2019/11/21

  • Disclosure Status

    Disclosed

  • Doc Name

    داسو ٹرانسمیشن لائن پروجیکٹ کے لئے دوبارہ آبادکاری ایکشن پلان : مختصر خلاصہ

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

Citation

Pakistan

Pakistan - First Phase of the Dasu Hydropower Project : Resettlement Plan : داسو ٹرانسمیشن لائن پروجیکٹ کے لئے دوبارہ آبادکاری ایکشن پلان : مختصر خلاصہ (Urdu). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/380171574336407944/داسو-ٹرانسمیشن-لائن-پروجیکٹ-کے-لئے-دوبارہ-آبادکاری-ایکشن-پلان-مختصر-خلاصہ