Skip to Main Navigation

Yemen - Emergency Crisis Response Project : Environmental Assessment (Vol. 6) : وإطار الإدارة الاجتماعية للصندوق الاجتماعي للتنمية ، المرحلة الرابعة: الملحق 9 (Arabic)

The development objective of the Emergency Crisis Response Project for Yemen is to provide short-term employment and access to selected basic services to the most vulnerable; preserve existing implementation capacity of service delivery programs; and provide emergency cash transfers to the poor and vulnerable in response to the food crisis. Some of the negative impacts and mitigation measures include: (1) use dust control measures onsite, such as water spraying for dust suppression; (2) cover lorries transporting friable construction materials and spoil; (3) provide adequate protective wear for workers, and equipment must be maintained regularly to avoid any emissions; (4) regular inspection and examinations for impacts and address them through maintenance replacement of materials spoiled; (5) for handling and occupational health applying strict protection regulation for occupational health measurements is critical and a site-specific management plan is required-including all operational stages from handling, washing, classification, freezing, backing up to loading and distribution to consumption; (6) maintain records and procedures for equipment maintenance, handling, and storage of liquid fuels and chemicals; lab regular testing for ground and surface water; (7) encourage drying mechanisms to avoid stagnant water; (8) frequently inspect the cistern for leakage and the houses for expected damages from leakages; and (9) avoid creating congested and unsafe road conditions at intersections, and in villages and towns.

Details

  • Author

    Yemen

  • Document Date

    2015/02/19

  • Document Type

    Environmental Assessment

  • Report Number

    SFG5353

  • Volume No

    6

  • Total Volume(s)

    9

  • Country

    Yemen, Yemen Republic of

  • Region

    Middle East and North Africa,

  • Disclosure Date

    2019/04/01

  • Disclosure Status

    Disclosed

  • Doc Name

    وإطار الإدارة الاجتماعية للصندوق الاجتماعي للتنمية ، المرحلة الرابعة: الملحق 9

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Yemen

Yemen - Emergency Crisis Response Project : Environmental Assessment (Vol. 6) : وإطار الإدارة الاجتماعية للصندوق الاجتماعي للتنمية ، المرحلة الرابعة: الملحق 9 (Arabic). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/386491554182457917/وإطار-الإدارة-الاجتماعية-للصندوق-الاجتماعي-للتنمية-المرحلة-الرابعة-الملحق-9