The development objective of the Emergency Crisis Response Project for Yemen is to provide short-term employment and access to selected basic services to the most vulnerable; preserve existing implementation capacity of service delivery programs; and provide emergency cash transfers to the poor and vulnerable in response to the food crisis. Some of the negative impacts and mitigation measures include: (1) use dust control measures onsite, such as water spraying for dust suppression; (2) cover lorries transporting friable construction materials and spoil; (3) provide adequate protective wear for workers, and equipment must be maintained regularly to avoid any emissions; (4) regular inspection and examinations for impacts and address them through maintenance replacement of materials spoiled; (5) for handling and occupational health applying strict protection regulation for occupational health measurements is critical and a site-specific management plan is required-including all operational stages from handling, washing, classification, freezing, backing up to loading and distribution to consumption; (6) maintain records and procedures for equipment maintenance, handling, and storage of liquid fuels and chemicals; lab regular testing for ground and surface water; (7) encourage drying mechanisms to avoid stagnant water; (8) frequently inspect the cistern for leakage and the houses for expected damages from leakages; and (9) avoid creating congested and unsafe road conditions at intersections, and in villages and towns.
Details
-
Author
Yemen
-
Document Date
2015/02/19
-
Document Type
Environmental Assessment
-
Report Number
SFG5353
-
Volume No
6
-
Total Volume(s)
9
-
Country
Yemen, Yemen Republic of
-
Region
-
Disclosure Date
2019/04/01
-
Disclosure Status
Disclosed
-
Doc Name
وإطار الإدارة الاجتماعية للصندوق الاجتماعي للتنمية ، المرحلة الرابعة: الملحق 9
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Yemen
Yemen - Emergency Crisis Response Project : Environmental Assessment (Vol. 6) : وإطار الإدارة الاجتماعية للصندوق الاجتماعي للتنمية ، المرحلة الرابعة: الملحق 9 (Arabic). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/386491554182457917/وإطار-الإدارة-الاجتماعية-للصندوق-الاجتماعي-للتنمية-المرحلة-الرابعة-الملحق-9