Skip to Main Navigation

Timor-Leste - Power Sector Priority Investments (English)

Details

  • Document Date

    2009/02/23

  • Document Type

    Implementation Completion Report Review

  • Report Number

    ICRR13049

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Timor-Leste,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2016/09/23

  • Disclosure Status

    Disclosed

  • Doc Name

    Timor-Leste - Power Sector Priority Investments

  • Keywords

    kilowatt hour of electricity;access to urban service;Internal rate of return;economic and financial analysis;fuel cost saving;electricity service;energy efficient lamp;compact fluorescent lamp;public sector capacity;cost of fuel;net present value;energy consumption behavior;risk mitigation plan;average load factor;cost of supply;revenues from oil;efficiency and quality;quality of supervision;basic electricity service;power sector investment;delay in procurement;increase energy efficiency;end-use energy efficiency;greenhouse gas emission;Access to Electricity;country assistance strategy;cost recovery measure;Country Assistance Strategies;change cost;availability of resource;sustainable service delivery;project costing;power supply;generation capacity;government budget;political disturbance;consumer energy;outcome indicator;prepayment meter;peak load;diesel generator;project intervention;insufficient information;government's budget;civil unrest;government expenditure;Fiscal Sustainability;macroeconomic environment;political unrest;conservative assumption;local condition;sensitivity analysis;fiscal impact;risk assessment;Safeguard Policies;cost-effective option;management contractor;capacity choice;staff turnover;incremental cost;price contingency;qualified consultant;safeguard policy;power network;power supplier;capacity factor;international standard;generating capacity;financial rate;energy output;billing issue;outcome targets;sustainable energy;Energy Sector;power service;end-use efficiency;government subsidy;income effect;billing system;electric service;transmission line;economic instability;institutional risk;quality rating;beneficiary survey;result indicator;project delays;Government Performance;distribution network;emergency need;base load;rehabilitation component;distribution component;social unrest;economic recovery;project datum;national power;public budget;oil price;financial resource;gas reserve;economic shock;environmental hazard;government capacity;donor assistance;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Timor-Leste - Power Sector Priority Investments (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/391031474634643747/Timor-Leste-Power-Sector-Priority-Investments