Details
-
Author
-
Document Date
2013/12/30
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR12723
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Iraq - Dokan and Derbandikhan Emergency Hydro Power Project : P099059 - Implementation Status Results Report : Sequence 15
-
Keywords
generation capacity;emergency recovery loan;rehabilitation plan;quality assessment;rehabilitation need;physical implementation;substation equipment;equipment purchase;intake structures;hydraulic system;operational problems;financial agreement;effective capacity;existing contract;change orders;power supply;hydropower station;operational staff;hydropower plant;program assessment;power capacity;prevention work;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Esen,Ferhat
Iraq - Dokan and Derbandikhan Emergency Hydro Power Project : P099059 - Implementation Status Results Report : Sequence 15 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/392741468254370187/Iraq-Dokan-and-Derbandikhan-Emergency-Hydro-Power-Project-P099059-Implementation-Status-Results-Report-Sequence-15