Details
-
Document Date
2003/07/23
-
Document Type
Integrated Safeguards Data Sheet
-
Report Number
AC164
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2003/07/24
-
Disclosure Status
Disclosed
-
Doc Name
Tanzania - Central Transport Corridor Project
-
Keywords
safeguard policy;Safeguard Policies;Environmental and Social Safeguard;Environmental and Social Impact;process of information sharing;resettlement action plan;civil works;safeguard issue;series of workshops;social development fund;performance based contract;roads and highway;landlocked countries;public health impact;trade and investment;critical natural habitats;negative environmental impact;alleviation of poverty;institutional capacity building;safeguard specialist;land take;cumulative impact;irreversible impacts;road design;road sector;Environmental Assessment;Programmatic Approach;social characteristic;environmental community;environmental specialist;safeguards compliance;institutional risk;financial intermediaries;program priorities;Land tenure;safeguards data;feasibility level;cultural impact;law makers;local population;Natural Resources;management capacity;poverty impact;geographic location;audit services;involuntary resettlement;gravel surface;road system;trade center;road safety;socioeconomic impact;health hazard;safety hazard;river pollution;protected area;aids program;baseline study;awareness program;road component;commercial basis;project datum;infrastructure service;road program;financing system;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Tanzania - Central Transport Corridor Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/399521468119348209/Tanzania-Central-Transport-Corridor-Project