Skip to Main Navigation

Yemen - Emergency Crisis Response Project : Environmental Assessment (Vol. 7) : الصندوق الاجتماعي للتنمیة دلیل العملیات : الملحق 10 (Arabic)

The development objective of the Emergency Crisis Response Project for Yemen is to provide short-term employment and access to selected basic services to the most vulnerable; preserve existing implementation capacity of service delivery programs; and provide emergency cash transfers to the poor and vulnerable in response to the food crisis. Some of the negative impacts and mitigation measures include: (1) use dust control measures onsite, such as water spraying for dust suppression; (2) cover lorries transporting friable construction materials and spoil; (3) provide adequate protective wear for workers, and equipment must be maintained regularly to avoid any emissions; (4) regular inspection and examinations for impacts and address them through maintenance replacement of materials spoiled; (5) for handling and occupational health applying strict protection regulation for occupational health measurements is critical and a site-specific management plan is required-including all operational stages from handling, washing, classification, freezing, backing up to loading and distribution to consumption; (6) maintain records and procedures for equipment maintenance, handling, and storage of liquid fuels and chemicals; lab regular testing for ground and surface water; (7) encourage drying mechanisms to avoid stagnant water; (8) frequently inspect the cistern for leakage and the houses for expected damages from leakages; and (9) avoid creating congested and unsafe road conditions at intersections, and in villages and towns.

Details

  • Author

    Yemen

  • Document Date

    2010/05/01

  • Document Type

    Environmental Assessment

  • Report Number

    SFG5353

  • Volume No

    7

  • Total Volume(s)

    9

  • Country

    Yemen, Yemen Republic of

  • Region

    Middle East and North Africa,

  • Disclosure Date

    2019/04/01

  • Disclosure Status

    Disclosed

  • Doc Name

    الصندوق الاجتماعي للتنمیة دلیل العملیات : الملحق 10

  • Keywords

    Small and Micro Enterprise Development Unit; rights of children with disability; Quality and Cost Based Selection; access to primary health care; independent board; social and economic development; monitoring and evaluation tool; access to basic service; Environmental and Social Safeguard; decentralization of education service; subproject cycle; procurement of consultant; agriculture and livestock; human resource development; water and environment; social capital development; national development plan; creating job opportunity; sustainable microfinance institution; intangible cultural heritage; amount of loan; income generating activity; termination of contract; internal control system; level of performance; chart of account; access to water; women at risk; Environmental Management Plan; gross domestic product; road maintenance fund; world health organization; number of beneficiaries; local government body; bottom up planning; rural area; adverse environmental impact; internal audit system; allocation of fund; information for development; source of income; integration of woman; flood protection work; traditional irrigation systems; high value crops; cost of transportation; capacity of community; semi skilled labor; quality and quantity; source income; income generating opportunity; micro finance industry; maintenance of infrastructure; public investment program; access to infrastructure; per capita cost; student per classroom; degree of poverty; cash accounting basis; sources of fund; Solid Waste Management; effective decision making; choice of technology; council of minister; quality of education; basic water need; national water strategy; rooftop rainwater harvesting; human resource management; health service coverage; improving learning environment; reproductive health service; mental health care; person with disability; education for child; education child; poor community; invitation to bid; alleviation of poverty

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Yemen

Yemen - Emergency Crisis Response Project : Environmental Assessment (Vol. 7) : الصندوق الاجتماعي للتنمیة دلیل العملیات : الملحق 10 (Arabic). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/417721554181784527/الصندوق-الاجتماعي-للتنمیة-دلیل-العملیات-الملحق-10