Skip to Main Navigation

Vietnam - Medium Cities Development Project : Additional Financing : Resettlement Plan (Vol. 2) : Updated Resettlement Plan for Phu Ly City Sub-Project (English)

The development objective of the Additional Financing for Medium Cities Development Project for Vietnam is to increase access to improved urban infrastructure services in three selected medium sized cities, Lao Cai, Phu Ly, and Vinh, in a sustainable and efficient manner. Some of the negative impacts are includes : (i) Land users with legal or legalizable rights to use the affected land; (ii) land users with temporary or leased rights to use land that cannot be legalized as long- term land user; (iii) land users without legal rights to use the land; (iv) land acquired with structures built therein and the remaining land is sufficient to rebuild onmarginal or severe impacts; (v) land acquired with structures built therein and the remaining land is not sufficient to rebuild on; (vi) houses or structures located in the project recovered area; (vii) loss of standing crops and trees; (viii) loss of income and business/other productive assets; (ix) temporary loss of agricultural land and residential land; (x) community buildings, structures, community forest/grazing/or other land/ irrigation systems affected by temporary or permanent land acquisition or spoil disposal; Some of the mitigation measures are includes : (i) cash compensation for crops and trees at market price; (ii) cash compensation for acquired land equivalent to remained investment put on the land; or equivalent to 30 percent of replacement cost; (iii) compensation for loss of trees and crops at full replacement cost; (iv) cash compensation for land at 100 percent of replacement cost of the land acquired to the legal/legalize users; cash compensation equivalent to the remaining values invested in such lands, or equivalent to 50 percent of replacement prices of land to the users having no legal land use rights; (v) compensation for land with replacement cost and and an amount of cash for building infrastructure so they can arrange the new location; (vi) no deduction will be made for depreciation or salvageable materials; (vii) compensation in cash at market value on the basis of type, age, and productive value; (viii) restoration of land to its previous or better quality by providing measures to improve land quality in cases of land being adversely affected or acidified; (ix) replacement in areas identified in consultation with affected communities and relevant authorities;

Details

  • Author

    Joint Venture of Waterco-Intec

  • Document Date

    2020/06/01

  • Document Type

    Resettlement Plan

  • Report Number

    SFG2691

  • Volume No

    2

  • Total Volume(s)

    2

  • Country

    Vietnam,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2020/08/10

  • Disclosure Status

    Disclosed

  • Doc Name

    Updated Resettlement Plan for Phu Ly City Sub-Project

  • Keywords

    affected households; educational level; water supply and sanitation; Environmental and Social Impact; Environmental and Social Safeguard; resettlement plan; unit price; agricultural land; residential land; technical infrastructure; Resettlement Policy Framework; compensation for land; parcel of land; land use right; supply of materials; Social Impact Assessment; environmental sanitation improvement; water supply system; improvement of road; living condition; average income level; case of embezzlement; compensation for loss; loss of income; local government official; compensation in cash; cost materials; payment of compensation; impact of land; land acquisition; resettlement area; compensation plan; drainage system; mitigation measure; land area; household affect; socio-economic survey; survey results; Exchange Rates; land price; replacement cost; involuntary resettlement; compensation policy; resettlement land; compensation rate; construction work; vulnerable household; construction material; land plot; construction area; public consultation; internal monitoring; community consultation; legal framework; land pricing; construction schedule; construction activities; tax authorities; tax authority; land clearance; construction period; household impact; urban development; construction site; compensation payment; urban roads; state agency; basic infrastructure; support policy; lighting systems; price list; asbestos cement; use area; market price; use value; drainage pipe; construction process; rapid assessment; business income; Public Facilities; power line; sewer system; housing price; transition period; construction contractor; traffic warning; wood panels; steel plates; loud noise; vibration level; business interruption; productive asset; local safety; land allocation; provincial territory; annual crop; career change; collected information; land law; business account; daily activity; traffic risk; enterprise income; income loss; construction method; trade component; survey household; regulation policy; public servant; inflation rate; timber tree; Support for Agriculture; reclaimed land; total compensation; subsistence allowance; fruit tree; job changing; Vocational Training; replacement value; compensation criterion; daily life; evaluation result; surface water; urban population; pavement layer; pumping station; electric meter; state budget; residential area; power system; drainage structure; Urban Infrastructure; economic efficiency; transparent information; investment efficiency; income restoration; information sources; Cultural House; national highway; social affairs; resettlement assistance; provincial budget; monitoring indicator; main road; remedial measure; counterpart fund; independent audit; construction supervision; contract management; funding source; Traffic Safety; installation work; support crop

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Joint Venture of Waterco-Intec

Vietnam - Medium Cities Development Project : Additional Financing : Resettlement Plan (Vol. 2) : Updated Resettlement Plan for Phu Ly City Sub-Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/419991480500658469/Updated-Resettlement-Plan-for-Phu-Ly-City-Sub-Project